Well its almost done so who cares about the past. A few more years and it will be very useful.
Ha ha.. they actually had to remove the small amount they built of the 1995 Eg West subway.
By the way, I emailed them explaining how to fix the zoom level on the TBM tracker embedded Google Maps iframe, and they fixed it:
http://thecrosstown.ca/progress/track-the-tunnel-machine
(earlier it was always zoomed in really far into the launch shaft)
Yes I'm taking credit
considering its been 3 weeks since it was updated, they are probably getting very, very close to Eglinton West.
considering its been 3 weeks since it was updated, they are probably getting very, very close to Eglinton West.
Probably slowing down as it approaches the Allen.
Doesn't everything.
I'm speculating that the contractor had unused float in the schedule (a good thing - meaning they finished the segment well before the drop dead date) and they aren't advancing so they don't have the TBM coming out into daylight before they are ready for it. Or maybe they have a photo op date in mind for the breakthrough (after the election?) and aren't playing any cards. The second TBM appears to have stopped moving also. Wonder if it will be a single or double breakthrough.
- Paul