We need to hear from you! Join us at any of three Public Workshops.
Tell us what you think about Eglinton’s future with the coming Metrolinx investment in transit infrastructure:
- How to encourage significant mixed-use growth through well-designed, right-sized buildings that are predominantly mid rise in scale
- How to create a beautiful, vibrant public realm and streetscape that offers a high quality of life for neighbourhoods as well as the many people who will live, work and shop on Eglinton
- How on-street uses can interact with the new Eglinton-Crosstown Light Rail Transit (LRT) stops and stations
Additionally, Metrolinx will be presenting preliminary designs for stations, including some that were not part of previous consultations. Designs for LRT surface stops and alignments will also be shown. The Kennedy Mobility Hub and parts of the line that are currently under review by Metrolinx will not be discussed at these events.
All Workshops: Drop in any time between 5:30 and 9:00pm
Presentation & Workshop start at 6:30pm
Transportation Study - Notice of Commencement
The underground portion of the new Eglinton Crosstown Light Rail Transit (LRT) will run for 12km between Black Creek Drive and Brentcliffe (which may be extended to Don Mills). As a result of this new underground transit service, some bus/carpool lanes may no longer be needed. As part of EGLINTON connects, the City of Toronto is studying options for making the best use of this roadway space to serve all users, including pedestrians, cyclists and motorists.
This Transportation Study will follow a Municipal Class Environmental Assessment (Class EA) Schedule ‘C’ process, which includes identifying the problem/opportunity, developing and evaluating a reasonable range of alternative solutions, and providing opportunities for public input.