JSF-1
Active Member
Made a little map of possible lines if Metrolinx owned all the tracks in the GTHA/Golden Horseshoe instead of having to work with CN and CP. I avoided using abandoned and disused lines with an exception being the connection between the Midtown and Richmond Hill lines. I am really bothered by the fact there is no connection between West Habour and Hamilton and building one would be hard as there is an inconveniently placed cemetery in the way.