Toronto The Forest Hill 1 + 2 | ?m | 19s | Lash Group | Richmond Architects

Hi Pandean - welcome to UT.

The developers' name is in the title of every thread already, and catcher_of_cats was just trying to tell luxome that he was asking about the pricelist in the wrong place. Just getting you up to speed!

42
 
Hello everyone,

I just drove by 500 St. Clair, and the glazing is going up up up...

(note, I tried to link a picture from my blog, but don't know how.... as such, image attached).
 

Attachments

  • 500 St Clair(2).JPG
    500 St Clair(2).JPG
    68.8 KB · Views: 258
Last edited:
The roof was still not finish when I went by it on Tuesday.

The weather is playing some delay, but it is moving more slowly for some reason.
 
Scaled Model

After visiting the sales office ... I'm beginning to like this project ~ :)

Southeast, Southwest, Northwest, Northeast Elevations
Click to Enlarge
 
October 14 2009 update

Northwest + Southwest Elevations - windows being installed on the 15th floor
Click to Enlarge
 
^I can't see your photos Solaris. "Bandwidth exceeded."

sorry UD ... my account exceeded the Photobucket 10GB monthly limit ... it will be resetted and working again on the 21st :eek:
 
Any updates for the week? Thanks Solaris, drum118, and urbandreamer!

Roof still not on.

Lane way been rebuilt with concrete being pour this week.

More windows installed.
 
1 November 2009 photo update

Just before sunset, this building served as a beacon all along St Clair (paving is finally done so no longer a nightmare to drive along this street: whew!) with the sunset glowing off of it. As a mirror, the building succeeds! It's almost bearable....:p

dsc00593l.jpg


dsc00594v.jpg


How soon before ROW is up and running? Soon, by the looks of it:

dsc00584t.jpg


In anticipation of the opening, lotsa new businesses--especially upscale restaurants--seem to be or about to open.
 
Last edited: