Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

Aug 30, 2023

416CAF44-B4BF-4648-8A38-B2E6332559C2.jpeg



143F8455-EFAC-4839-97F4-2863FE68472E.jpeg



DAC8C4B9-3C6C-4DED-BE4B-884F3AC255CA_1_201_a.jpeg



4B55A501-EC95-43AC-9E82-BA1692CA63D0_1_201_a.jpeg



58BCD5E9-A535-43D6-B2F6-CB1588C65E3F_1_201_a.jpeg



557EA6C6-2D0B-474B-84E9-97FD0DC42D33_1_201_a.jpeg



C277B7F7-FA5C-4131-9BA3-063EE99FE541_1_201_a.jpeg



4A897A6B-F7EB-4D39-8E12-08DC722A964E_1_201_a.jpeg



A8D4EDCE-2310-422C-9614-DCA590725198_1_201_a.jpeg

FACDFC44-7BE0-45ED-8404-06799E20EFEC_1_201_a.jpeg



43E1B9FF-1A84-4BA7-A549-F136DC8B8D8D_1_201_a.jpeg



C18BBD6A-F4E6-49F7-9365-5793BC5D6A57_1_201_a.jpeg



9DB9CF91-F260-4E60-AD51-388566878E1C_1_201_a.jpeg



7AE8FEA3-42AF-4F53-BF32-DF91C35D6259.jpeg
 
Aug 11
Just up a load of photos from my backlog up to my site
53165261519_a3de3a1d00_b.jpg

53165262769_3d058b0746_b.jpg

53165051256_bb2da9522b_b.jpg

53165534563_57da23e2ae_b.jpg

53164451397_f66290c951_b.jpg

53165522028_0d6925c2cd_b.jpg

53165240559_df6be74631_b.jpg

53165473100_ceb1724d58_b.jpg
 
Much work going on at the Portland Commons site for a Saturday. Lots of crew on site and both cranes in operation. Some notes: Two large Domestic Hot Water tanks were lifted up to the mechanical penthouse earlier today - my apologies, did not get down to the street in time to get a photo of them. Two smaller expansion tanks for the hot water heating system are also currently staged on the ground ready for lifting into place.

Portland Street itself is closed between Front and Niagara streets with two big float trucks holding four large air handling units (AHU's - as marked in the wrap on the units), also being lifted up to the mechanical penthouse today. The final photo is the sidewalk announcement of Portland Street to be closed on September 16 - presumably for crane removal.

20230909_100306.jpg


20230909_134704.jpg


20230909_134803.jpg


20230909_134858.jpg


20230909_135404.jpg
 
The north tower crane is coming down today. First photos - the mobile crane has arrived and been set up - it is not as large a mobile as some, the tower crane is not that high and is close to the street, so not that much leverage is needed. First counterweight is coming down.

1000001013.jpg


1000001014.jpg


20230916_082121.jpg
 