No site work or excavation yet. This lot is still being used as a parking lot. It looks the same as the pics on the last page (except for the snow).
I have a feeling this project will bite the credit-crisis dust.
progress being made here ~
********
CONDOMINIUM BUILDING
Proj: 9073668-10
Toronto, Metro Toronto Reg ON NEGOTIATED/WORKING DRAWINGS
LTD, 20-24 Bathurst St, Fort York, M5V
$35,000,000 est
Start: October, 2009 Complete: February, 2012
Note: Sales and marketing are underway. Preliminary Working drawings are ongoing. Working drawings are expected November, 2009. Sub trade tender schedules will be finalized early Fall, 2009. Further update September, 2009.
Project: caisson pile foundation, drilled caissons, cast-in-place concrete structural frame, curtainwall exterior, concrete tile roof, fuel fired heating system, heat pumps; landscaped roof; various interior finishes; proposed construction of a condominium building.
Scope: 130,000 square feet; 15 storeys; 1 storey below grade; 180 units
Development: New
Category: Apartment bldgs
First report Mon Nov 19, 2007. Last report Fri Jun 19, 2009.
This report Thu Aug 13, 2009.
I have a feeling it will be a very, very long time before we see excavation begin.
I have a feeling this project will bite the credit-crisis dust.
given the delivery timeline of Malibu (phase 1) ... I expect there to be like 2-3 years delay after the estimated completed date (if construction happens)
Again...Such Doom and Gloom from the seniors, i guess Malibu Investment inc. have proven you all wrong