Toronto 500 Sherbourne | ?m | 34s | Times Group | Northgrave

They are working on the "roof" on South side today.

5240_99744588540_661213540_2138488_6112896_n.jpg


5240_99744553540_661213540_2138483_2112777_n.jpg


5240_99744573540_661213540_2138486_7507273_n.jpg
 
actually, the building looks pretty nice now; I especially like the sail-like roof, much better than the Verve top!
 
Although I still think the colors don't match, the building's coming along quite nicely. The ground floor 2 storey lofts should look nice.
 
a notice has been posted across from the 500 (on the East side of Sherbourne) that an application has been made to tear down the existing high rise building and replace it with a 38 floors rental building with more than 400 units. That sounds like lots of noise and dust for many years to come.
Is that the beginning of the re-juvination of St. Jamestown?
 
I don't believe they are tearing any buildings down except for the single story store between them. The new building will be constructed on top.

There is an existing thread for this project.
 
ProjectEnd: constructed on top of what (after the single story building has been demolished)?
 
Nothing, technically. I assume they will be recreating the grocery store on the main level, so above that then. The thread, which I am too lazy to search for, contains city documents which detail where this will be located.
 
I don't believe they are tearing any buildings down except for the single story store between them. The new building will be constructed on top.

There is an existing thread for this project.

545-565 Sherbourne St. (Medallion Properties, 38s, Page + Steele)

Proposed 38 storey residential tower with new food store in podium, to be located between existing apartment buildings at 555 and 565 Sherbourne Street

City Planning Preliminary Report: http://www.toronto.ca/legdocs/mmis/2009/te/bgrd/backgroundfile-19705.pdf
 
The beige part of the roof is done on the South side. More Drywall were delivered on Friday. They are working on windows again. A few up on 23rd floor & also 2nd / 3rd floor.

5240_101726558540_661213540_2163688_7735560_n.jpg


5240_101726568540_661213540_2163689_7883875_n.jpg


North view
5240_101726538540_661213540_2163685_5272152_n.jpg


South view
5240_101726543540_661213540_2163686_1951064_n.jpg
 
Will try to take some pictures of the seperate loft when it's sunny. The glass windows on the 1st 2 floors (East side) are almost done. Workers are working the interior.
 
Last edited:
July 21 Update

Two vertical stitched jobs (apologies!) and three other shots

Click on the thumbnail to enlarge, then click again on the image for full size.

Vertical stitches -



 

Back
Top