On CP24... a brick wall under construction at the top of the tower was knocked down by high winds.

God, this site is CURSED lol
 
Photo taken July 4th, 2009
3696173050_144dbd347f_o.jpg

From this angle if it was done it would lok almost like a render
 
http://www.theglobeandmail.com/news/national/toronto/wall-of-building-collapses/article1210208/


Wall of building collapses

Two cyclists injured as bricks from structure under construction shower downtown street

Dakshana Bascararmurty

Two cyclists were taken to hospital Tuesday evening when the wall of a building in the midst of construction collapsed, sending hundreds of bricks raining down onto the street.

The bricks tumbled down 32 storeys from a building that was under construction on Sherbourne Street at Wellesley Street. Police said the wall was unsupported.

The two people who were hit by the falling bricks received only minor injuries, said Toronto police Staff Sergeant Jim Mackrell.

The road was closed to traffic after the accident, the asphalt coated by dust and littered with bricks.

Inspectors from the City of Toronto and the province's Ministry of Labour will visit the site to investigate why the wall collapsed.

“[They] will no doubt be looking at this [Wednesday] because walls shouldn't fall off buildings, and God help us if they do,†said Staff Sgt. Mackrell.
 
Wow, getting hit by bricks from 32 stories up and only sustaining minor injuries... Talk about lucky (unless you are a negative person, then being hit was unlucky).

From CTV:
450_bricks_090707.jpg
 
Last edited:
Good grief. This could have been so much worse what with pedestrians and vehicles down below on a busy street. Thankfully no one was killed in this accident.
 
I'm sure the developer will be sued and will settle out of court... I would definitely sue.
 
July 9-09

What's left of 500 from King & Sherbourne and from above, respectively

Click on the thumbnail to enlarge, then click again on the image for full size.

 
it blends very well in with St. Jamestown, doesn't it?!

To be fair that photo is a little overexposed from strong late afternoon sun even though I did pull it down a touch. The precast is actually beige (darker than 500's low-rise lofts in the foreground) which can be observed accurately when up close to the building. From a distance, the precast becomes much lighter presumably because the precast picks up off the gray cladding which is why I stated back a few pages that the building looks best from a distance.

Below is a closeup of the precast taken back in February which is an accurate visual representation of the beige precast.

Click on the thumbnail to enlarge, then click again on the image for full size.

 
Took a couple of shots today at about noon. They are pouring some tar or gravel. Notice in the 2nd picture, tar/gravel pouring out of the container. In the 3rd picture, the workers noticed me & they actually sorta pose for a picture before letting the " empty container" go. lol...

5240_98271088540_661213540_2112407_4888389_n.jpg


5240_98271053540_661213540_2112401_6915615_n.jpg


5240_98271058540_661213540_2112402_6467879_n.jpg
 
Last edited:
The roof top beige "precast" (sorry I don't know what it's suppose to be called) is done, I think. This is how the building looks as of noon, from the North side.

5240_98271093540_661213540_2112408_5791393_n.jpg


5240_98271108540_661213540_2112409_7981797_n.jpg
 