Building things seems to take forever in Ontario. But tearing things up? We're quick at that :-/Diamond with CN being decommissioned in next few weeks.
A look at the rails on Queen St in Brampton. What's this work that is going on at the site opposite of Queen St where the rails and I believe old CP freight sidings/yard were?
View attachment 577617
Building things seems to take forever in Ontario. But tearing things up? We're quick at that :-/
It's gone!
I stopped by the diamond this evening and the south track portion was gone and the CN crews were busy cutting rail to remove the north track portion. The OBRY signals were still lit.
A moments silence...
The Parks Department has told me they aren't even remotely considering the possibility of preserving rail capacity along the corridorBids and Tenders - Brampton
brampton.bidsandtenders.ca
Looks like Brampton's started a bid for detailed design of the OBRY.
So long as they don't build any structures over top the land where the track used to be, then the rail can always return.The Parks Department has told me they aren't even remotely considering the possibility of preserving rail capacity along the corridor
The track will most likely not return.So long as they don't build any structures over top the land where the track used to be, then the rail can always return.