Avonshire (Yonge/401, Tridel/K&G, 14 + 21 + 3x 22s, Kirkor) COMPLETE

ProjectEnd ... there were previously 2 cranes erected on site for the 22s rental replacement tower @ 105 Harrison Garden Blvd~

However, Carter is referring to the fact that there is a new (3rd) crane which is used for the construction of the two 21s Avonshire towers @ 110 Harrison Garden Blvd, I suspect there a 4th crane will follow shortly ... thus one crane for each 21s tower

masterplan_640.jpg
 
Are there plans to allow residents from Avonshire and the neighbouring Avondale neighbourhood to exit onto Sheppard. Right now, the only way in/out of the nabe is through Avondale Ave and onto Yonge. Traffic there is horrendous.

I heard that Doris is supposed to be extended south at some point? Anyone know when that is planned for? I would imagine they'd need to expropriate some properties to do this.
 
lead82 ... there are plans to extend the NYCC East Ring Road (Doris Ave) south of Sheppard Avenue to connect to Avondale Avenue ... in fact houses on the west side on Bonnington Place and north side of Annadale Drive (west of Bonnington) have already been expropriated by the City for the planned ring road extension, I suspect road construction to happen very soon ... however to be 100% sure you'll have to contact City Planning for details

This previous posts in the Minto Spring thread may provide some info:
Annadale Drive extension to Yonge Street is part of North York Centre's planned ring road network ... the planned alignment is along the southern edge of the Hullmark Centre (Metro's) property

Details of this alignment are described in the City Planning Staff Report for Minto Gardens Phase 2 (Spring) from March 2007

see pages 24 + 25 :)

NYC_SW_ringroad.jpg
 
Are there plans to allow residents from Avonshire and the neighbouring Avondale neighbourhood to exit onto Sheppard. Right now, the only way in/out of the nabe is through Avondale Ave and onto Yonge. Traffic there is horrendous.

It is currently possible to exit onto Sheppard from Bonnington, at least turn eastbounds. I've never needed to turn westbounds so I'm not sure if there are any left turn restrictions.
 
Daily Commercial News

My understanding:
  • Bldgs A+B are the first 2 Avonshire condo towers - phase 1
  • Bldg E is the rental replacement tower
  • Bldgs C+D is the phase 2 'pair' of Avonshire condos located east of the phase 1 'pair'
This suggests that Avonshire Phase 2 (Bldgs C+D) will start sales and marketing in Fall 2009 ~ coming soon !!

However, I can't quite figure out what Bldgs F+G is (referenced in the second article below) ... according to the City Planning Final Report, there were only going to be 5 tower + 8 blocks of townhouses, but description of Bldgs F+G suggests they are 22-23s towers :confused:
************

CONDOMINIUM APARTMENT BLDG, TOWNHOUSES
Proj: 1323367-10
Toronto, Metro Toronto Reg ON
NEGOTIATED/PLANNING
Avonshire Apartments, Buildings C and D, 1 Oakburn Cres, Avondale Ave, M2N 2T3
$55,500,000 est


Start: November, 2009

Complete: January, 2011

Note: Detailed design is complete. The project scope will be finalized pending completion of buildings A and B, report number 9072458. Sales and marketing are expected to begin Fall, 2009. Arch expects Working drawings will begin based on sales and completion of Buildings A, B and E. Sub trade tender and construction schedules are undetermined. Further update mid-September, 2009.

Project: concrete foundation, concrete tilt-up structural frame, curtainwall exterior, EIFS exterior, masonry exterior, fuel fired heating system, proposed construction of two condominium buildings. Building C will be approx 148,000 sq ft, 14 to 18 storeys and 127 units. Building D will be 239,000 sq ft, 18 to 21 storeys and 199 units. Construction of 65 three-storey condominium townhouses in three structures with a total area will be 91,400 sq ft will be built with this phase. A three acre park will be built as part of this phase and provided by the Owner to the City of Toronto. Buildings A and B can be followed under report number 9072458. Buildings F and G can be followed under report number 9079691. Building E can now be followed under report number 9093591.

Scope: 478,400 square feet; 21 storeys; 5 structures; 367 units; parking for 400 cars

Development: New

Category: Apartment bldgs

First report Tue Mar 22, 2005. Last report Tue Jun 02, 2009.
This report Wed Aug 19, 2009.


http://www.dailycommercialnews.com/cgi-bin/top10.pl?rm=show_top10_project&id=1e7d2161a3ca73fddb25fbe7ffbb020a51a832d0&projectid=1323367&region=ontario
**************

CONDOMINIUM APARTMENT BUILDINGS
Proj: 9079691-6
Toronto, Metro Toronto Reg ON
NEGOTIATED/PLANNING
Avonshire Apartment buildings, buildings F and G, Oakburn Cres, Avondale Ave, N2M 2T3
$60,000,000 est


Note: Detailed design is complete. The project scope will be finalized pending completion of buildings A and B, and E report numbers 9072458 and 9093591. Sales and marketing are expected to begin Fall/Winter, 2009. Arch expects Working drawings will begin based on sales and completion of Buildings A, B and E. Gen Cont has yet to determine Sub trade tender and construction schedules for these buildings. Further update early December, 2009.

Project: proposed construction of two 22 to 23 storey condominium apartment buildings. The number of units is undetermined. Buildings A, B and E can be followed under report number 9072458. 41 three-storey condo townhouses to be built above buildings A and B can now be followed under report number 9089272. Buildings C and D can be followed under report number 1323367.

Scope: 550,000 square feet; 23 storeys; 2 structures

Development: New

Category: Apartment bldgs

First report Wed Apr 09, 2008. Last report Tue Jun 02, 2009.
This report Wed Aug 19, 2009.


http://www.dailycommercialnews.com/cgi-bin/top10.pl?rm=show_top10_project&id=39dbf48ca104a5abe1edea2e1c80e7825f674483&projectid=9079691&region=ontario
 
Last edited:
Renderings

Next phase coming soon @ Avonshire ... townhomes north of the first 3 towers, located next to the future community park ~

Avonshire Townhome Site Plan
th_plan_800.jpg


Renderings
park_aerial2_480.jpg


park_aerial_480.jpg


Blocks B+C - 9+7 Oakburn Crescent
townhome_480.jpg


Block B - 9 Oakburn Crescent
th_b_east_480.jpg

th_b_north_480.jpg

th_b_west_480.jpg


Block C - 7 Oakburn Crescent
th_c_west_480.jpg


Block D - 5 Oakburn Crescent
th_d_north_480.jpg

th_d_south_480.jpg
 
Townhomes Preview this weekend (Sept 26-Sept 27)

Received email yesterday which included price and layouts for the town homes.

It hurts just looking at those prices....but the price per sqft is pretty good for this area.
 

Attachments

  • townhome_preview.JPG
    townhome_preview.JPG
    33.8 KB · Views: 365
  • townhome_price.JPG
    townhome_price.JPG
    48.2 KB · Views: 367
Oh the choices! I can have Bad for Expensive, or, if I'm feeling flush, Really Bad for Really Expensive!

Like sooooooooooooo exciting!
 
This rental building has reached the 8th or 9th floor, I just took a quick glance at this piece of faux crap going up.
 
Oh Leon, it's not faux crap, it's genuine crap.

42
 
Daily Commercial News

CONDOMINIUM TOWNHOUSES
Proj: 9079691-7
Toronto, Metro Toronto Reg ON
NEGOTIATED/PLANNING
Avonshire Apartment buildings, phases F and G, Oakburn Cres, Avondale Ave, N2M 2T3
$60,000,000 est


Note: The project scope has changed. Schedules for design, tender and construction will be finalized pending completion of buildings A and B, and E report numbers 9072458 and 9093591. Sales and marketing are expected to begin early 2010. Further update January, 2010.

Project: proposed construction of condominium townhouses. The number of units and structures are undetermined.

Development: New

Category: Apartment bldgs

First report Wed Apr 09, 2008. Last report Wed Aug 19, 2009.
This report Fri Oct 02, 2009.


http://www.dailycommercialnews.com/cgi-bin/top10.pl?rm=show_top10_project&id=39dbf48ca104a5abe1edea2e1c80e7825f674483&projectid=9079691&region=ontario
 
October 12 2009 update

Avonshire Towers 1+2 (Bldgs A+B) are still excavating ~
Click to Enlarge


Avonshire's rental replacement tower (Bldg E) is on the 12th floor ~