4449 and 4451 are now in Lambton yard and came in on the same train.
Depending on CP as to what they do this weekend, its possible one car could get delivery to Hillcrest any day before the shut down or sit in the yard until work starts again.
Since 4449 is over 105 days so far, it could be the first or last car drop off for off loading, 4458 and 4459 will be the next cars to go if following number remains. This will leave 7 more car to be ship with 2 in May and 2 in June at this time. At this rate, it will be year end for all cars are back on TTC property..
It is possible a few extra transporter could show up to speed things along.
4458 flat was pull from the train with issues,