Towered
Superstar
Something I missed in my first reading, that's of interest:
Lastly, the CIP identified the need to replace the existing fixed block signalling system on Line 4 with ATC in order to enable deployment of 6-car consists, matching capacity long-term ridership demand - this program is currently unfunded.
The TTC is musing about upgrading the Sheppard Line to handle full-length trains.
That would require spending some $$$ on the stations!
It would be great if they could start by tiling the bare concrete walls!