Toronto West Condos | 46.51m | 14s | Aspen Ridge | Core Architects

Jun 27, 2022

0D13F90A-4760-4FEC-ACCF-C689B8774EE4.jpeg



CBF48579-36A9-4F42-BBFF-005E7FE66C9C.jpeg



58B22129-6892-4F33-9808-59383A03FD69.jpeg



B62D7A13-D2A6-4A91-A45F-80DFEA08DC4A.jpeg



245F82E2-0CC8-4467-BDE3-2F6E2DBE64CA.jpeg



72FC0A71-F929-4ED4-955C-7D49F598BC16.jpeg



F9E02335-6586-4EFF-B48A-F8BAEAD11DA9.jpeg



3C614D13-8347-4BED-905B-100BC4A82513.jpeg



4D46FF59-38CC-4342-AEDC-D706733EC658.jpeg



56F42E52-6581-49D9-8D22-56F72C68C341.jpeg



1DBA8E14-F76E-4063-8B0B-AAB7BB634EF5.jpeg



C8E26687-255F-4ED9-8E90-089A5B4660C9.jpeg



61035BCB-CCD7-4DA7-8DFC-0102670041D6_1_201_a.jpeg



8FB16272-4BB8-4BEF-8093-4CDF98B85BB9_1_201_a.jpeg



5F1BD3B6-B019-4C93-8911-AAE640818725.jpeg
 
Photos taken July 2nd, 2022:

First, from the north, looking across the site at 64 Bathurst:

DSC08371.JPG


DSC08375.JPG


Now, from the Bathurst street bridge, first through the superstructure; then from just south of same:

DSC08381.JPG


DSC08382.JPG
 
August 22, 2022: One of the two cranes is coming down today (weather permitting). First photo - the cable and hook assembly have been removed. Second photo - the boom is coming down. Right now, activities are at a standstill due to the weather.

@interchange42

20220819_182515.jpg


20220822_083353.jpg
 
Last edited: