Work has resumed on taking down the east tower crane. The Apex has been removed and the control cab section is going.

@interchange42

20220822_102136.jpg
 
September 28, 2022 - Second crane being prepared for removal. The hoisting cable and hook have been removed. Main structural elements are now all in place, with the remaining cladding and interior finishes to be done. Somewhat symmetrical in a sense, with the current phase of West's construction coming to a close, with the news that the 2 Tecumseth project - right across the street, is finally gearing up.

20220928_131336.jpg
 

Back