Brampton UPtowns at Heart Lake | ?m | 4s | VANDYK

Is there any chance this actually gets built in 2024, or are we really looking at October 2025? Anybody with thoughts or insights from the builder or closely tied realtors?
 
Is there any chance this actually gets built in 2024, or are we really looking at October 2025? Anybody with thoughts or insights from the builder or closely tied realtors?
I think current tentative occupancy date is Oct 2024 not Oct 2025. But it always changes. Let’s hope it won’t delay beyond Q12025.
 
Last edited:
I think current tentative occupancy date is Oct 2024 not Oct 2025. But it always changes. Let’s hope it won’t delay beyond Q12025.
Oh yes thats right - Oct 2024 and May 2025 is outside occupancy
 
I see workers, at least??
98424D1F-8586-4398-A087-241EBD843D77.jpeg
F6E581D5-B213-4A50-A6A0-0738D986CDF0.jpeg
7F6615C3-AD6F-41E1-A1C3-EF0295667303.jpeg
2702A95D-0C5C-4A96-A7C7-DA973A27DBC1.jpeg
 
The construction update email is not much of an update 😑
Yes.. Thats great news.. I mentioned before .. Once they start pouring concrete .. Consider it done meaning the Foundation and next stages will be easy .. The hard tasks of the garage is done.. When i was talking to the engineer last year he told me that.... Will be upside now
 
Yes.. Thats great news.. I mentioned before .. Once they start pouring concrete .. Consider it done meaning the Foundation and next stages will be easy .. The hard tasks of the garage is done.. When i was talking to the engineer last year he told me that.... Will be upside now
Fair enough. The building at the back seems slow to me. Just one block has gotten to the second floor. Although they have done the foundation for 3/4 other blocks
 

Back
Top