Toronto Sugar Wharf Condominiums (Phase 1) | 231m | 70s | Menkes | a—A

163696C5-CF24-46E8-8690-E41BED65E762.jpeg
 
A working Saturday Jan. 9.

CF1731F4-1058-4EB0-AFBF-3FECD01D0D52.jpeg


The south/east tower structural transfer floor - level 9 is being poured today.
3DA0EAA1-D20E-4050-A9A4-205351E6168B.jpeg


The north/west tower transfer floor - level 12 is just starting.
17BB25E1-17AA-4800-8E17-D567D4BCC444.jpeg


A real steamer.
EA9E860D-4D4D-42E8-AD47-30F62D6776ED.jpeg


The north podium is almost topped out.
14BE7B15-C630-4A80-BAB9-035A58FDA2C9.jpeg


913E0D08-403D-4B0D-A14B-258CCCD87689.jpeg


FB3D1C6E-EE53-4D01-8463-3D10124E3107.jpeg


I won’t lose my view of the Innovation Centre....
53E7437E-E613-4838-8D8C-624152211547.jpeg


but I will probably lose this view by June 1.
930B9EB1-C834-4992-B43D-17F37D41B427.jpeg
 
20210111_145510.jpg
 

Attachments

  • 20210111_145452.jpg
    20210111_145452.jpg
    396.9 KB · Views: 210
Last edited:
Just a question but with a lot of these projects why do the images at the top of the project pages not match what is being built. Or rather why are these images not up to date or even get replaced with the accurate pictures. So we can use them as a reference as to what being built rather then try to remember where, what the page the latest updated pictures are. Or get a sorry comment saying renders up to date please. Kinda hard to comment on projects when we don’t know what they are actually going to look like. This project is the perfect example
 
Just a question but with a lot of these projects why do the images at the top of the project pages not match what is being built. Or rather why are these images not up to date or even get replaced with the accurate pictures. So we can use them as a reference as to what being built rather then try to remember where, what the page the latest updated pictures are. Or get a sorry comment saying renders up to date please. Kinda hard to comment on projects when we don’t know what they are actually going to look like. This project is the perfect example
Projects change. There are so many dozens of factors influencing how a project finally lands that almost every project is going to differ somehow from the renderings. UrbanToronto keeps the renderings in project pages quite reliably up to date but to know what is really being built requires the drawings. The closest the public can get is to look at the submitted SPA drawings for most projects.
 

Back
Top