How much road salt do they use in Amsterdam? Does the braking mechanism for streetcars there use sand? (hmm ... I'm guessing that will be no more with the new streetcars).
Yesterday up to Bay (from the east) is open as blocks of the section Bay to Bathurst (though 95% finished) are being used for pedestrian detours, work areas etc and there are certainly unfinished blocks (at the bridge, at Rees Street and at Spadina and then closer to Bathurst. I had previously been on QQ about 10 days ago and they have done LOTS of work in those 10 days.How much of the repaved MGT is currently bikeable/open?
How much road salt do they use in Amsterdam? Does the braking mechanism for streetcars there use sand? (hmm ... I'm guessing that will be no more with the new streetcars).
What's happening with the metal fishes that use to be embedded in the sidewalk at Pier 6? As far as I remember they were supposed to be somehow integrated in the new sidewalk or used in some other way.
Sorry. I don't usually miss posts on this threat. But I missed this one.That was answered a few posts above...
Sorry. I don't usually miss posts on this threat. But I missed this one.
The area needs 2 controller, not the one as plan and will be a few days late going east as plan. Even if the eastbound is not in place until new week, no big deal as it will be finally done.Something strange today: they have done the re-signalling at Simcoe and skipped the Harbourfront Centre TTC Stop/Queen's Quay Terminal West Driveway lights. Anybody know the reason? The notice said they would go block by block west, with Harbourfront Centre today and Simcoe tomorrow, but they've swapped the two. Strange.