Toronto Portland Commons | 71.7m | 15s | Carttera | Sweeny &Co

F05BBEFC-7D3A-4D1F-974C-CFCA6D8B3DA8.jpeg


98D87ED4-DFBA-4ACB-8E77-85C577D3DF99.jpeg


CDFA497D-B28D-4061-8E4A-9DDD4E381013.jpeg


1C13864A-4F12-4902-B37A-B043B7C936CB.jpeg
 
^Great shots! The first thing that I noticed, though, was the Teronni truck! Lol
Saturday - March 2. Just one overview photo from this morning. Also, a quick note regarding the Terroni truck - not entirely out of place here, after all the Terroni corporate offices are, and have been for a long while, in the legacy Portland Commons building at 510 Front Street (the yellowish brick building, now basically hidden along the east side of the new building)

20240302_115110.jpg
 
A few more from Saturday, March 2. First, several photos of the work being done around the ground level perimeter of the new building, and then secondly, a couple of photos of the now largely hidden legacy 510 Front Street West building.

Along Front Street:

1000003545.jpg


1000003544.jpg


1000003543.jpg


1000003541.jpg


Along Portland Street:

1000003542.jpg


1000003541.jpg


The legacy 510 Front Street West building:

1000003539.jpg


1000003540.jpg
 
A few more from Saturday, March 2. First, several photos of the work being done around the ground level perimeter of the new building, and then secondly, a couple of photos of the now largely hidden legacy 510 Front Street West building.

Along Front Street:

1000003545.jpg


1000003544.jpg


1000003543.jpg


Along Portland Street:

1000003541.jpg


1000003542.jpg


The legacy 510 Front Street West building:

1000003539.jpg


1000003540.jpg
 

Attachments

  • 1000003545.jpg
    1000003545.jpg
    414.2 KB · Views: 53
  • 1000003544.jpg
    1000003544.jpg
    440.1 KB · Views: 40
  • 1000003542.jpg
    1000003542.jpg
    330.8 KB · Views: 41
  • 1000003541.jpg
    1000003541.jpg
    373 KB · Views: 41
  • 1000003540.jpg
    1000003540.jpg
    363.3 KB · Views: 36
  • 1000003539.jpg
    1000003539.jpg
    299.7 KB · Views: 39
Views from different vantage points… the warm metal looks good, but the glass portion is very grim (even more grim in person than in the photos) - the glass looks awful compared to the glass used in the Well next door. The overall effect is quite suburban office park like. I’m a big YIMBY but Toronto developers + architects really need to do better.
IMG_4090.jpeg
IMG_4081.jpeg
IMG_4109.jpeg
IMG_4111.jpeg
 
March 7: The stacks of roof top tiles have been staged on the roof sections for a number of weeks - their installation has finally started. The crew shown in the detail picture can be seen in the larger photo, the top left (north) corner of the podium roof top. Gives an idea of the scale of the Portland Commons building.

20240307_155528.jpg


1000003645.jpg
 

Back
Top