khaldoon
Active Member
I have see cement trucks use the ramps for the other 3 towers, but looks like M4 is steeper. Haven't follow M4 as it out of sight for me and have taken a step back for shooting. It's not the first time buckets have been used to pour something in a hole like this. Be year end before that hole is fully dug
Come mid 2025, this will be the 2nd tallest building in Mississauga until something comes along that will top it and M3
I think it will be the 3rd tallest. M4 is only 216m while the tallest Exchange tower will be 232m.