Mississauga M3 at M City | 260.29m | 77s | Rogers Real Estate | Arcadis

Today.

0ADBFBC0-E4D9-4EDF-9C97-DD9770059744.jpeg
 
I don't mind the look of the renders for M3, but kind of interesting how M1 and M2, being shorter, are the more "out there" buildings in the group of MCity... you would think the tallest one would have the most bold design
 
Still catching up on posting a bunch of photos.
April 2nd
1681738422921.jpeg
1681738458666.jpeg
1681738481520.jpeg
 
I think they are pouring the base for a crane(s). But not sure they are using the most efficient method - pouring concrete into buckets ( including an excavator’s) then driving them down the pit. I imagine the cement trucks may not be able to climb the steep ramp.

View attachment 481554
I have see cement trucks use the ramps for the other 3 towers, but looks like M4 is steeper. Haven't follow M4 as it out of sight for me and have taken a step back for shooting. It's not the first time buckets have been used to pour something in a hole like this. Be year end before that hole is fully dug

Come mid 2025, this will be the 2nd tallest building in Mississauga until something comes along that will top it and M3
 

Back
Top