Toronto Kings Club at King High Line | 57.6m | 18s | First Capital | Kasian

From a couple days ago:

IMG_9052.jpg
IMG_9053.jpg
IMG_9054.jpg
IMG_9055.jpg


42
 

Attachments

  • IMG_9052.jpg
    IMG_9052.jpg
    355.5 KB · Views: 1,003
  • IMG_9053.jpg
    IMG_9053.jpg
    352.3 KB · Views: 995
  • IMG_9054.jpg
    IMG_9054.jpg
    346.8 KB · Views: 997
  • IMG_9055.jpg
    IMG_9055.jpg
    371.3 KB · Views: 999
Here's how King HighLine currently looks from across the tracks beside Sudbury Street (with the last one from behind a set of townhomes):

DSC08705.jpg
DSC08706.jpg
DSC08712.jpg


42
 

Attachments

  • DSC08705.jpg
    DSC08705.jpg
    285.4 KB · Views: 767
  • DSC08706.jpg
    DSC08706.jpg
    287.1 KB · Views: 781
  • DSC08712.jpg
    DSC08712.jpg
    250.7 KB · Views: 772
Quintessential hyperbole. There is zero indication of how this will end up based on what I've just shot.

42
 
Quintessential sycophantry from UT staff.

Don't need to be an Oracle to glean that this building will end up a giant turd pile.
 
Quintessential sycophantry from UT staff.

Don't need to be an Oracle to glean that this building will end up a giant turd pile.
Sycophantry? Not a word.

Sycophancy? Not even slightly. I made no editorial comment whatsoever. You, however, are determined to slag something that you are providing not a scrap of information on, nor even any commentary other than some lazy ass burn. If you accuse me of something, have something less lazy and cheap to back it up.

42
 
Is pendantry a word? How about hypersensitivity?

I am entitled to my opinion just like you are entitled to ballwash the local development industry.

Nope, pendantry is not a word. Do you not have spellcheck?

In regards to your next line, the vulgarity is not called for and is not in line with the UrbanToronto Rules of Conduct. You can object to this building, any building, but don't drag insults into it, or you are out of here.

42
 
I think time off for a holiday at the seaside.

42
 
On the first page there's a post from 2011 about the ground being cleared already. Did this take 4 years from demo to building? Seems longer than usual.
 

Back
Top