Toronto Ivy Condos | 102.41m | 32s | Dream | RAW Design

Hi everyone. I am renting across the building so if you have any questions about how construction is going, feel free to ask me! I also have a unit in this condo. I will post recent pictures below to show everyone the construction
0D19E216-93CD-41B4-8009-C045854E919B.jpeg

C199E599-D03B-40D0-9ECB-B0CA4B48D901.jpeg


8F0954C8-210E-4E17-B497-C702A8B6CD2A.jpeg

235801C5-4898-458E-BE98-01A88ECF44B3.jpeg

95FD7709-7289-466F-B0E3-A931EE6C46C3.jpeg

06F262FA-B888-46E8-8671-D68AA2FA895C.jpeg

57FA7935-7871-456C-8BFC-E25AE187E7AF.jpeg
 
Last edited:
so i don't know how they're going about construction but it seems like the units in the south aren't as developed. you can see all the units on the right side (all the way to the top) still have a lot of work to be done
23FD6619-C0BC-44D6-8B61-84EFA6970906.jpeg
 
Last edited:
I believe the hoist is located on the south side, so these are the hoist suites. The hoist will need to come down before these suites can be ready for occupancy
so i don't know how they're going about construction but it seems like the units in the south aren't as developed. you can see all the units on the right side (all the way to the top) still have a lot of work to be done
 
It's not unfortunate. Balconies are not great for energy efficiency and in most cases tend to be very under-used spaces (though admittedly the people that love them, love them a lot).
 
Can anybody get inside the building to take some pictures of the lobby and other facilities? Thanks!
My occupancy is on Feb 15th but I am highly suspect if everything is completed and ready for use.
Lobby pic. It was taken on Feb 5th when we did our PDI.
IMG_9296.png
 

Attachments

  • IMG_9296.png
    IMG_9296.png
    1.4 MB · Views: 25
The bike room at Ivy seems ill-conceived i.e. on the ground floor with access directly to the street and giant windows that allow anyone to look-in and see exactly what's on offer.
 

Back
Top