drum118
Superstar
July 03
All photos now up on site
You can see a wall being built in the inbound track tunnel for the walkway that will connect to the south ramp. Without being up close, it hard to say if there will be a tunnel for the walkway as the shoring indicates there could be one or it will be for the access from the parking lot on the southside of the creek. That is a wide walkway to the right
New intersection now in service with the old one close and lights turn off/removed as of today
This is where Mary Fix Creek goes under Hurontario and no idea at this time if it will be rebuilt and widen at the same time for the LRT since this is where the guideway will be built on the west side before moving to the centre of the road behind this shot along with a sidewalk.
Area prepared for the curb to be pour and sidewalk to the right of the poles.
Existing duct bank and the curb to be pour to the left of it
All photos now up on site
You can see a wall being built in the inbound track tunnel for the walkway that will connect to the south ramp. Without being up close, it hard to say if there will be a tunnel for the walkway as the shoring indicates there could be one or it will be for the access from the parking lot on the southside of the creek. That is a wide walkway to the right
New intersection now in service with the old one close and lights turn off/removed as of today
This is where Mary Fix Creek goes under Hurontario and no idea at this time if it will be rebuilt and widen at the same time for the LRT since this is where the guideway will be built on the west side before moving to the centre of the road behind this shot along with a sidewalk.
Area prepared for the curb to be pour and sidewalk to the right of the poles.
Existing duct bank and the curb to be pour to the left of it