June 18
I had to go to Sq One this afternoon and decided to kill a few birds along the way, Use the Valleys to Fairview to have a look at the Alba Condos and then head north on Hurontario to the 403 before going to Sq One.
Finally got a look at traffic for Fairview. Traffic was backup going north on the Valley from Fairview to Central Pkwy and blocking driveways that southbound could turn into their residents. traffic was light on Fairview heading east and will be plug in an hour time. Westbound was backup to the Valley from Hurontario with only one lane open for turning in both directions as well going west as only 1-4 cars were getting across Hurontario. Eastbound traffic from the west was very heavy than nominal
A number of eastbound Fairview drivers crossing Hurontario barely been miss getting hit by a southbound drivers running the red light to make a left turn.
A few northbound ones barely miss get hit by southbound cars pulling a U-turn in the open space of the construction zone for Central Parky intersection who fail to yield to the northbound traffic to make a right turn onto CP.
Nothing has taken place for the substation other than the hole dug for it.
"Oh!!" what do I see on the Led Signs?? Was expecting it that the the CP intersection was to reopen on June 24 and it will now be July 03 if that. Only a few intersections have reopen as schedule with most been late by a few day to 2 weeks. They are ready to pour one huge block of concrete for the road between the 2 tracks. Rails are wrap for concrete, but framing of the tracks still has to be done. Don't recall seeing this at other intersection, then I have seen every intersections poured
Sure hope Mobilinx partners are supplying their crews with water and taking more break in for the heat like I have seen on some projects I been on in the last 10 years.
One thing I noticed was the northbound track curves to the east from the southside of the intersection for the platform at CP.. Nothing new for CP Platform.
Took a break in the shard at Elm Dr and watch was taking place for the intersection, A few pedestrians came close crossing Elm W as well southside of Elm for Hurontario by car turning illegal on a red or a U-turn without stopping. The Northbound traffic wasn't backup to CP like it has been in the past, but close to 3/4 of the way, Again, only 4-6 cars are making a turn on the green and the major issues for most intersections that have backup on Hurontario.
Duct work is being place for the Burnhamthorpe station and it will be about 200' walk to it from Burnhamthorpe and the worse position station today from the intersection. In one sense you can say the station is almost in the centre of Matthew Gates and Burnhamthorpe. The placement could be because of the T connection for Burnhamthorpe, but remembering Topflight layout, the platform can be closer to Burnhamthorpe than it is.
The heat got to me and cancel rest of my plan trip by heading to Sq One to cool off.
Photos will be up in the next day or so. I was sure on the last batch I posted today as I wasn't happy with the shots and the 2 videos I shot from an 103 bus from Brampton that was 20km over the limit and the camera setting wasn't for that speed.
I had to slow down the speed of this video and the 2 videos are short due to the bag of groceries falling off the seat or the floor for the high area to get a better shot than driving the route. I also had the focus issue since I did no have the video camera with me since I had no plans to shoot videos when I left home on June 09.