drum118
Superstar
The current plans call for the line to open from Steels to Park St using the Rathburn station by 2026 at the rate it been built. As for the 2 extension opening dates depends on the province giving the green light to build them. At this point in time, will the Brampton extension be on the surface or in the $500 million tunnel to win seats and please Brampton Council??One wonders if they will open the line without the original scope completed.
No EA on the books at this time nor does the city know when it will be for the expanded loop.
The line could open in late 2025 from MCC to Steeles to meet Ford needs for an election in 2026 as a show and tell how he is building transit or from Derry to MCC early 2025 for an election that year. This will have major impact on the 30 year contract as well the 5 year warranty period.
Now Alstom has given up trying to fix the boogies of Ottawa LRV fleet that happens to be the same LRV's coming for Hurontario Line, I guess the first car for the line that been in Kingston for testing and dealing with Ottawa LRV's since last year will now be shipped to the OMSF.
It will have no place to run since there is no overhead in place outside of OMSF at this time. The first thing that will take place will be the towing of the LRV from OMSF to Eglinton this summer to see if there are issues with the line and if so fix them. Once they are fix and the OS in place, the LRV will do a walking speed to test the OS and any fixes. If it past the test, the LRV will increase the testing speed until it meets the speed limit test requirements. Then training starts.
The test bed is now Topflight to Eglinton in place of Matheson that was supposed to started in February this year. The extra tracks lengths will reduce the burn-in stage and allow drivers more training. Also to show everyone one what is coming down the road. Will not see the testing to MCC until early 2025 as there is no bridge over the 403 nor is the elevated section built as well the elevated T connection.