Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

Line 7 is supposed to be the vapourware Eglinton East LRT. No idea what lines 8 and 9 will be but you can rest assured they will not be built in the natural lifespans of 90% of the forum.
So... why is this Line 10? I thought Finch was just line 6, which ones are Lines 7 through 9?
 
TTC uses Line 8 for Jane LRT.

I think the idea is that it's separated somewhat from the other numbers, and that Hurontario used to be Highway 10.

I guess that means that a Line 5 branch needs to leave Renforth, drop down to Dundas, Anne head towards Hamilton.

I can't wait until Line 11! :)
 
So... why is this Line 10? I thought Finch was just line 6, which ones are Lines 7 through 9?
The real answer is that someone thought it was cute to call it line 10 in honour of provincial highway 10 which, decades ago, ran along Hurontario.

EDIT: Just realized I opened this tab and the answer was given after I opened it but before I responded. Oops.
 
Line 7 is supposed to be the vapourware Eglinton East LRT. No idea what lines 8 and 9 will be but you can rest assured they will not be built in the natural lifespans of 90% of the forum.
Lines 8 and 9 are "reserved" for the Jane and Sheppard East LRTs respectively by the TTC. Presumably Line 9 will be designation of the route that runs between Sheppard-McCowan and Malvern town Centre of Phase 2 of Eglinton is ever built (let alone Phase 1)
 
It’s also the first route outside the City of Toronto and it parallels historical Highway 10 (as much as it drives @Transportfan bananas). It’s fine! And it’s a lot easier to say and type than Doug’s crony.

(If Hamilton’s LRT gets numbered, it should be Line 11, for CHCH.)
Wasn't the Ion also a Metrolinx LRT? It's number is 301.
 
Wasn't the Ion also a Metrolinx LRT? It's number is 301.
No it was Waterloo project with a few Metrolinx LRV going to ION due to Metrolinx design issues and delaying production of the LRV's.
 
May 1
More up on my site
53708960589_e4f549604b_b.jpg

53708632866_da2028b61a_b.jpg


Need to check the Matheson station to see if the concrete has been pour
53708632406_7026283b55_b.jpg

53707719012_ac57d4fe91_b.jpg


Matheson Substation East Of The Shell Station
53707718857_9f71dbc069_b.jpg

53709063935_9927ff88b7_b.jpg
 
Not sure where to mention it, but just now at Cooksville station there were 7 construction workers discussing something right by where I come up to the station from Hurontario. They were standing around where the Presto machines are.

I don’t know what company they were from—the only one whose logo I could identify was a hard hat from CP.

Could it be planning for Milton 15 minute service? Or just minor stuff related to the Hurontario LRT? Impossible to say.
 