Have created Zone 24 to deal with the guideway from Hurontario to OMSF based on what I saw.

The first section of the new road is just being built with the section along the 407 to the OMSF mostly graded and wide enough for 2 lanes and the guideway.

They are in the process of building the bridge over the creek that is very beef up and question why at this time why no barrier wall to stop the creek from flooding this new road.
51983106722_d7481cfe91_b.jpg

51984122351_eee2b60a5d_b.jpg

51984182288_3c29f3414b_b.jpg

51984122521_382a399782_b.jpg

51983107167_2d794eedda_b.jpg

51984122751_0227b19651_b.jpg

51984182668_9b2d60bece_b.jpg

51984672395_1a9f7deaef_b.jpg

51984123036_c6d6987b30_b.jpg

51984399419_54c90c6033_b.jpg

51984399644_b8cac225dd_b.jpg

51983107922_ce0250a517_b.jpg

51984183283_3f7a2e9c08_b.jpg

51984399939_b947ccaf6d_b.jpg

51983108232_b18b321d15_b.jpg

51984400089_87b3c2cb89_b.jpg
 
April 03
VIA was using track 3 to Union

Not sure what is taking place, but no new rails for the Box to go under them are in place yet.
51985087183_0cddd1f6fb_b.jpg

51984015682_0369ecc590_b.jpg

51985313214_145e36b545_b.jpg

51985313344_d9d31fcedb_b.jpg

51985028301_f22062f5f2_b.jpg

51985313534_bde7eacdc8_b.jpg

51985580440_4f41e6280c_b.jpg
 
"Gorchynski said his crusade for an additional station on the 18-kilometre light rail transit (LRT) route, now known as the Hazel McCallion Line, brought them together in 2018.

“That’s why we were introduced — when she was running as a Progressive Conservative candidate. There’s probably no one who knows more about the Hurontario LRT than I do,” he said of the 19-stop line running from Mississauga’s Lakeshore West GO station to Brampton." (emphasis added)


Um, no.
 
"Gorchynski said his crusade for an additional station on the 18-kilometre light rail transit (LRT) route, now known as the Hazel McCallion Line, brought them together in 2018.

“That’s why we were introduced — when she was running as a Progressive Conservative candidate. There’s probably no one who knows more about the Hurontario LRT than I do,” he said of the 19-stop line running from Mississauga’s Lakeshore West GO station to Brampton." (emphasis added)


Um, no.
You saying he doesn't know more about the line than others??
 
I enthusiastically am, yes.
You know he has written a number of business cases per the line as well for the Kingsbridge station that has put ML to shame. Has major investment in that plaza on the west side that will see new development. Part of the committee for the construction of the line.

The posting has nothing to do with the line in the first place other a lover thing that were supports of the line.
 
^ Great, he has opinions (which I'm sure he feels are "business cases" except they aren't at the level Metrolinx/actual professional consultants do). Lots of people do. I don't agree with him. It's been reviewed and rejected.

Actually, the article is completely on topic. It's alleged that someone tried to bribe a government MPP to get a new station on the Hurontario LRT. This is the Hurontario LRT thread.

The article quotes the MPP's statement of defense names the Hurontario LRT so it's on topic even if you don't agree, and enjoy sitting with him on the constitution liaison committee.

"Kusendova’s statement of defence said that Gorchynski “got involved with her romantically for the sole purpose of lobbying for the LRT stop … and exploiting her political office to do so.”"
 
Last edited:
April 22
Looks like some of the material or all of it for the track bridge is now on site in the storage area.

Some unexpected issues have risen that has push the tunnel move back a month or 2 at this time.

The east sidewalk is a lot higher than before for the underpass that reduce the slop for it. At the same time, the north section is being shift a lane to the east as the north bound lanes are being shift as well. Hard to get clear shots as traffic was bumper to bumper all the way to the QEW.

By the looks of things, the current left turn to the QEW westbound is going to be remove and replace with a right hand on ramp. The current off ramp to go south will be shift to the westside after the northbound ramp open. Wouldn't be surprised if the eastbound off ramp to go northbound will be shift to the east side of Hurontario. This would remove the current 3 stop light to one for the south service road. Its possible it could be remove and force drivers to make a U-turn at the north service road lights.
52023015021_dc6377f552_b.jpg

52023015131_86817628f9_b.jpg

52023048183_bf4b414e83_b.jpg

52023261039_028df7eb02_b.jpg

52023525920_0603f01f04_b.jpg

52023016611_e1af4d4f49_b.jpg

52023526155_3c6955c34c_b.jpg

52021975102_e47278b92e_b.jpg

52023526485_d4daecaa27_b.jpg

52023049213_69fc5ffe1b_b.jpg

52023017311_cece1565b5_b.jpg

52021975597_caef46516d_b.jpg
 
I think we should just call this HRT which covers both Hazel and Hurontario and then the court of public opinion will decide what the acronym actually stands for.

I’m still hoping for a huge hazel scandal being released before this LRT comes to fruition which will kill this silly name. (It’s silly because every dang thing in Mississauga is named after hazel as of no other person has ever lived here or mattered)
 

Back
Top