It's been a terrible month for construction. It apparently rained 25 of 31 days in October.
They recently completed adding the extra lane on Poyntz Avenue.
Here is a picture from a couple of weeks ago when the lines and the turn arrows were just being added.
The extra lane on the north side has required re-alignment of the pedestrian cross walk from the east side of Yonge at the south end of Hullmark. The crosswalk is now diagonal, without full pedestrian walk signals for those trying to cross from east to west.
Moreover, Hullmark construction (subway entrance?) on the east side has forced closing of the east sidewalk from the P&G driveway to Sheppard. People are supposed to cross to the west side of Yonge and then proceed north to the Sheppard intersection to cross back to the east side. People on the east, coming south have the same problem when coming from Sheppard. If they are on the east side, they need to cross to the west, walk down two blocks to Poyntz and then cross back to the east side.
Of course many are just walking along the east lane of Yonge Street, with cars, large trucks and buses passing just inches from them.
NYk Drne,.... the lane configuration on Poyntz between Yonge and Beecroft is temporary.
The following still needs to be redone,... again!
- the corner of Poyntz and Beecroft still needs to be rebuilt with more of a curve
- the north side of Poyntz just west of Yonge still needs another lane of traffic added so it will align with the new Annedale extension south of Tridel-Hullmark Centre
- the north side sidwalk on Poyntz near Yonge will need to be redone and shifted another 10-15 feet north.
...Remember when Finch station had its subway ventilation system upgraded,... it took over 2 years and northbound Yonge traffic was reduced to about 1 or 2 lanes,.... that was a huge hassle,.....
Where did you get your information; only thing I could find on this was a hard to read map on the West Lansing Homeowners Association website, Traffic updates section, http://www.westlansing.ca/Development-Updates/Traffic-Updates.aspx, the map at the end of that posting is too small to really see and number of lanes is hard to make out.
NYk Drne,... you know what they say,... "Sorry, but I can't reveal my sources"
If you noticed,... on that West Lansing Homeowner's Association website you're refering to,... Phase 1 was supposed to be completed in summer of 2012,... but didn't even start until September and finished only a couple of weeks ago. Why? EmeraldPark is way behind schedule,... constant delay and stalling the city,.... this kept getting pushed back until it was basically at the end of the road construction season!
Phase two for aligning the new Anndale extension and Poyntz Ave (widening Poyntz another 10-15 feet north along the north side close to Yonge) is relatively simple and should have been done with the Phase 1 work on Poyntz,... originally scheduled for this fall or early 2013,... looks more like Fall 2013 now,... again, EmeraldPark is way behind schedule,... their east tower should have been way above ground level by now,...
I'll probably get a lot of disagreement on this but I've long thought that when Beecroft and Doris were extended to Finch that both of them should have been uni-directional: Beecroft southbound, Doris northbound.