ComptoirGeneral
New Member
Jesus they value engineered the value engineered concept. At least the wavy roof was mildly interesting. This new rending looks like complete crap and the only way I'll be satisfied is if they really do plan to integrate the entrance into a future tower. That future tower better be 300+ meters and an architectural landmarkI know that the first renderings were a complete pipe dream, but this is perhaps the biggest delta from concept to reality I've ever seen, other than the Pickering Casino catfish (there were no final renderings until construction was half-way)
What a complete piece of shit.
Original article from UT: https://urbantoronto.ca/news/2017/01/east-harbour-transit-hub-making-toronto.24658
Some early renders:
View attachment 635113
View attachment 635114
View attachment 635115
View attachment 635117
View attachment 635118
View attachment 635119