ushahid
Senior Member
The Geostructural Challenges Being Overcome by Grounded Engineering at CIBC SQUARE | UrbanToronto
Excavation projects conducted in urban environments can present numerous challenges at the best of times. As shoring consultants for the second phase of CIBC SQUARE in downtown Toronto, currently under excavation, Grounded Engineering had to contend not only with urban density, but transit...
urbantoronto.ca
saw this render in the front page story. are those trains on the left side of park? how do they get down on the track, do they take stairs?