Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

  • Thread starter Suicidal Gingerbread Man
  • Start date
A new mural today
Ramp heating pipe continues.
IMG_2637.jpeg


Earlier this morning.
IMG_2625.jpeg


June 12 - lower level heater
IMG_6513.jpeg


June 12 - gas main. Soon to find out if temporary
IMG_2498.jpeg




Today
Good thing the City issued that bridge construction hazard notice for Bay Street. Maybe some new scaffolding? I guess it gives the contractor the right to block traffic on the street at some point.
IMG_2636.jpeg


IMG_2633.jpeg


Bonus shot today
IMG_2634.jpeg



June 12 My fascination with window washing (equipment/process) continues. Maybe a new thread someday?
IMG_6514.jpeg


June 12
IMG_6515.jpeg



A few from Sunday June 23 below
IMG_6552.jpeg



Yonge St opened last week but they didn’t pave under the bridge….. yet? No new tunnel lighting……yet? They seemed to rush the last half of the underside of the bridge resurfacing in 2023 before the sewer and water main work or maybe the south end was in worse condition than the north end. Or maybe it was my complaint about the compressed air noise. The loudest thing I have ever heard in my life while walking through there with my poor dog too. Obviously still traumatized. Me not her. 🫨
I see The other One and maybe the crane at the NW corner of Yonge & Elm too.
IMG_6553.jpeg



IMG_6555.jpeg


It takes two pictures when shooting from Queen Quay (as a passenger @tstormers)
IMG_6554.jpeg


Lakeshore somewhere west of the Ex.
IMG_6556.jpeg
 

Back
Top