casaguy
Senior Member
Thanks for reviving this thread... I forgot how awesome these demolition pics were!
Hey Geek, that was a quick reply! Thanks! Wonder if the building to the left of the one that was demolished is still there, I think is at no 40, or is also slated to be demolished? Were they planing to build the tower over all of them, or just over the 46? http://www.plazacorp.com still has no info, I wolder what they are waiting for. Thanks.
Hey Geek, that was a quick reply! Thanks! Wonder if the building to the left of the one that was demolished is still there, I think is at no 40, or is also slated to be demolished? Were they planing to build the tower over all of them, or just over the 46? http://www.plazacorp.com still has no info, I wolder what they are waiting for. Thanks.
Yes, 40 Wellesley is still there. The offices have been mostly vacated for well over a year but a pharmacy and The Mix, a small variety store, still operate at ground level. The guys who lease the space at The Mix say they've heard nothing about having to vacate.
I thought there was a thread for 40 Wellesley, but I can't find it.
Here's an old Planning Report - http://www.toronto.ca/legdocs/2006/agendas/committees/te/te060404/it034.pdf
I'm pretty sure either 40 or 46 took the whole thing to the OMB, because one thought the other would impact the development potential of their site. As far as I know both developments are stalled until the OMB sorts it out