News   May 06, 2024
 559     1 
News   May 06, 2024
 1.2K     0 
News   May 06, 2024
 712     1 

Ryerson: Master Plan

I wanted to create a new thread but decided to do a forum search first and found this old thread. I'll leave it up to the admins (@interchange42 ) to decide if discussion should be kept in this thread, or moved to a new thread (you may use this and the following post as the OP), but I wanted a place to discuss the New Public Realm Plan for Ryerson University.

It was covered in this October UrbanToronto article:

Ryerson University Unveils New Public Realm Plan

"The plan highlights the importance of placemaking, planting, lighting, public art, and greenery, with public feedback putting first priority on Gould Street. Now, new concept designs are revealing an upgraded public realm that puts priority on pedestrian accessibility and safety, while improving the university's campus experience beyond the classrooms.

Among the many improvements being promised, new paving will be a major aesthetic element in the plan. Utilizing durable, high-quality paving materials, the existing pedestrian conditions surrounding the Image Arts Centre, Devonian Pond and the Student Learning Centre will be replicated and extended to the rest of the campus. Repaving efforts will be coordinated with the local BIA to ensure cohesion.

A number of other pedestrian improvements are also proposed, including a new 'Dismount Zone' in the area of Gould Plaza and Devonian Park, where bike traffic would be prohibited on weekdays from 8 AM to 6 PM. Instead, cyclists would dismount and walk their bikes through the area, keeping pedestrian traffic as the number one priority.

Proposed lighting improvements include the addition of "signature" pedestrian scale lighting on Gould, Victoria, Bond, and Church Street, as well as the introduction of decorative lighting in laneways. Other major lighting features being proposed include the architectural lighting of Kerr Hall, and the addition of specialized lighting for main building entrances and terminating vistas. All proposed lighting upgrades would be energy efficient, with the capability of being upgraded to LED lighting in the future."

Official Ryerson Announcement can be found here.
The PDF of the master plan can be found here.

Here is how the Master Plan intends to be phased:

Image_10.png
Image_11.png
Image_12.png


Also of interest, how the Church-Gould intersection is planned to be reconfigured:

Image_8.png
 

Attachments

  • Image_10.png
    Image_10.png
    540.1 KB · Views: 1,172
  • Image_11.png
    Image_11.png
    645.5 KB · Views: 1,163
  • Image_12.png
    Image_12.png
    622.3 KB · Views: 980
  • Image_8.png
    Image_8.png
    368.7 KB · Views: 953
I also took the opportunity to pull images from the PDF:

Gould Plaza + Nelson Mandela Walkway:

Image_1.png


Image_2.png


Gould Street Facing Church (Between Bond and Church):

Image_3.png


Gould at Yonge Gateway:

Image_4.png


Victoria at Dundas Gateway:

Image_5.png


Gould Street East (Between Church and Mutual):

Image_6.png


Campus Laneways:

Image_7.png
 
The error that is 10 Dundas East along Victoria (and the loading passage on Gould) is so fundamental that it will take more than a few trees, quality paving and dreamy, impressionistic renderings that fade out that context to correct. Regarding Victoria - if you even want to remotely fix the problem (hard to, given how overbearing and junky 10 Dundas is), you'd close off the entire existing sidewalk along the colonnade, extend the animated storefronts outward, rebuild the remaining ROW as the pedestrian realm.

AoD
 
Last edited:
Hats off to all of those currently unconceived future Rye students who will someday get to marinate in this bucolic utopia--and enjoy year round summer conditions.
 

Back
Top