Wonder how long the old bridge structure has. Can't be long until it's demolished.
According to the project site
https://www.qewdixie.com/closures, Spring 2025 for demolition.
Shoot the area a few weeks ago and the old bridge is being used to move material and equipment from the staging area to the work area on the east side of the new one. The earliest I can see the bridge being remove is Q2 in 2025 back then
They have removed part of the southbound lane on the north side to finish work on the new ramp to/from the North Service Rd. Traffic southbound is single lane and turning right at Sherway Dr as they have closed that southbound lane so they could square corner the new intersection and build the curb for the new alignment.
Traffic light are in place, but not turn on for the new intersection and expect it be turn on now or early November. They were building a temporary on ramp for the westbound QEW traffic so they can close the current road to finish building the new off ramp which will be next year work. They are still working on the storm water pond as well.
The old South Service Rd is history as it has been removed from Ogden to where the new east ramp to Dixie starts with light poles installed where to new ramp to the eastbound QEW is going to be. Even the old ramp from Dixie to the Service Rd is gone
The Ogden walkway is a long way from completion as they have most of the north ramp built, but nothing for the bridge and the southside.
The centre QEW has barriers on both sides of the centre barrier that will be replace by a concrete barrier and long over due to replace this style of barriers.
@Tim MacDonald, your photos show most of what I saw on the day I shot it.
One thing that struck me was miWay has put in a southbound bus stop at the new South Service Rd with non for northbound. Buses are using the new bus bays on Dixie, not the plaza.
The photos are still in my backlog and should be up next week or sooner.