micheal_can
Senior Member
Could this be a first step towards BRT/LRT in the Halton region? That is what happened with the YRT and DRT.
In principle, I support creating 'Halton Region Transit' as there's just enormous sense from an operation perspective and a customer perspective.
If one transit system is created for Halton, that would leave Peel as the only region that still has lower-tier transit. Kind of ironic giving the age and extent of urbanization there, but sort of making sense given its geography of having only two cities on top of one another with no other cities in the region on either side of them as they both span it.
With Caledon increasingly served by Brampton Transit. It’s the one place where regional transit isn’t at all necessary.
Burlington and Oakville had an LRT …… but it ended in 1925 due to lack of business. And it’s not returning. And by all accounts the Dundas BRT will be nothing but a city bus running a normal route in traffic with a differing paint colour.Could this be a first step towards BRT/LRT in the Halton region? That is what happened with the YRT and DRT.
Who’s to say.Burlington and Oakville had an LRT …… but it ended in 1925 due to lack of business. And it’s not returning. And by all accounts the Dundas BRT will be nothing but a city bus running a normal route in traffic with a differing paint colour.
Let’s not get carried away with any notions of mass transit beyond enhanced GO and VIA service, in combination with improving bus based transit.
Who’s to say.
Trafalgar is bound to get something someday, as development north of Dundas continues to sprawl, and it is quite dense for suburbia. It might come down to if the residents think an LRT is a sexy idea for their ‘town’. Halton/it’s municipalities can afford it.
We’re talking a timeline of 30+ years with RTPs. You don’t think a N/S LRT or BRT is possible?
Re Trafalgar. I can see some higher order of bus service extending from the Oakville GO transit node northwards, connecting with the college, Dundas transit node, GO bus connections at the 407 and then northwards to Milton. (I would copy that on Brontë Road as well)(And further west along Waterdown Road) Trafalgar from the GO station northwards could support a BRT type development at some point in its future.Who’s to say.
Trafalgar is bound to get something someday, as development north of Dundas continues to sprawl, and it is quite dense for suburbia. It might come down to if the residents think an LRT is a sexy idea for their ‘town’. Halton/it’s municipalities can afford it.
We’re talking a timeline of 30+ years with RTPs. You don’t think a N/S LRT or BRT is possible?
Classic.All of this discussion re a Halton Regional Transit system is far down the list
Yes, these numbers. Under the current goverments let’s invite everyone in immigration program, possibly you see these numbers. What the numbers do not illustrate is the myriad problems this policy and the related unprecedented growth has already created. And the lacking physical response to solving them. I am not sure that immigration policies do not change in the next election and we’ll see where we stand.Classic.
Let's build car-centric developments and when traffic becomes untenable try to overlay some transit a extraordinarily high cost.
Or... let's start planning now for appropriate transit infrastructure to support Halton's 75% increase in population over 30 years.
View attachment 587514
Re Trafalgar. I can see some higher order of bus service extending from the Oakville GO transit node northwards, connecting with the college, Dundas transit node, GO bus connections at the 407 and then northwards to Milton. (I would copy that on Brontë Road as well)(And further west along Waterdown Road) Trafalgar from the GO station northwards could support a BRT type development at some point in its future.
Beyond that, we are not comparing densities or distances with the Hazel Line connecting Steeles Avenue to the Port Credit Go. I do not see where LRT requirements are met. And we are certainly not tunneling down Trafalgar past the Oakville GO to the Lakeshore (the Brampton ask). Certain fiscal realities need to be recognized in all of these discussions.
The Dundas BRT is another issue entirely. An express service, separated from otherwise clogged traffic, would be advantageous. I hear that it will be initially delivered as a very low order of transit, basically a different paint colour running east-west on Dundas and will not become a proper BRT until well into Mississauga. Others, such as Drum, probably have greater insights into this project.
I am sure Halton residents have as great an aversion to paying higher levels of taxation as anyone, and they currently pay a higher property tax rate then Toronto (but less then Mississauga) . Capital infrastructure has been/is being spent on major bridge east/west connections between Burlington and Oakville (at least three projects), and the development of the regional road system to support the growth of Milton.
All of this discussion re a Halton Regional Transit system is far down the list. Major changes in transit serving the region will first come through Metrolinx - both rail and bus.
This is good to see that there have been ideas put forth.Maybe that is part of the reason for the amalgamation.Long time lurker here, my first time posting something. I wanted to shed some light on the Halton Region Transit Proposals. Below are some of the proposals from 2019 for some of the BRT-related transit projects.View attachment 587529View attachment 587530
This presentation to the council (July 2024) discusses more of the governance and amalgamation of transit services: https://edmweb.halton.ca/OnBaseAgendaOnline/Documents/ViewDocument/Transit Priority Corridor CA-18-24 PW-17-24 Presentation to Council.pdf.pdf?meetingId=4479&documentType=Agenda&itemId=127612&publishId=80242&isSection=false .View attachment 587532View attachment 587533View attachment 587534View attachment 587535View attachment 587536View attachment 587531
In light of LRT and BRT proposals, there have been quite a few proposals by Oakville and Milton during their draft transit master planning stages, however, none of them have gone past that stage into the operational plans. None of the plans seem to go to a BRT level of transit corridor, the proposed Oakville transit plan mentions a frequent network route along Dundas and Trafalgar.View attachment 587537View attachment 587538
In terms of Metrolinx's Proposals and planning this report from 2018 shows some of the frequent transit projects, not sure whether some of these have been axed or not: https://assets.metrolinx.com/image/...l_Transportation_Plan_Final_-_EDIT_kk1qax.pdf
View attachment 587540View attachment 587542
It seems that with the planned density along Trafalgar from Oakville Go to the Trafalgar Rd. @ Hwy. 407 Park & Ride seems to be the highest priority candidate for a LRT or BRT project.View attachment 587552
My first time posting, I apologize if this is a repeat of something discussed earlier or off-topic rambling.