drum118
Superstar
Nov 23
We may see the first roof section in place by Dec 23rd.
The blue steel frames are to support the columns until the roof top steel is tie in to all the columns. Its a safety precaution to prevent the steel frame falling down while trains are in service.
The columns are on either side of the existing roof truss framing by the VIA tracks.
We may see the first roof section in place by Dec 23rd.
The blue steel frames are to support the columns until the roof top steel is tie in to all the columns. Its a safety precaution to prevent the steel frame falling down while trains are in service.
The columns are on either side of the existing roof truss framing by the VIA tracks.