crs1026
Superstar
^Or somebody got wind of the Province planning to cancel, and this is Ottawa’s way of saying “We are still in.... is Ford walking away from free money”?
- Paul
- Paul
Verster's most notable quip wasn't the mantra to worship his masters at QP, it was to state: (gist) (To Trudeau) "Keep sending money".^Or somebody got wind of the Province planning to cancel, and this is Ottawa’s way of saying “We are still in.... is Ford walking away from free money”?
- Paul
^ Speaking of the Kitchener Corridor, I noticed a drill rig here at the 401/409 tunnel construction.
View attachment 173371
Have no idea what being used, other than they are there and haven't shot the area for sometime. Have seen them driving by them on the 401. They aren't test rigs/^ Ah, good question. Wasn't close enough to tell and not sure I'd be able to spot the difference between the two types of rigs. Given it was smaller in size, I'm going to guess it was for testing? @drum118 have any pictures?
Why would the provincial government not show up?
It's clearly a pre-election tour by the federal Liberals. Perhaps the Ontario Progressive Conservative Party doesn't support the federal Liberals?Why would the provincial government not show up?
Construction is definitely going on. A large drill rig is on site along with at least 5 construction trailers and other equipment.^ Ah, good question. Wasn't close enough to tell and not sure I'd be able to spot the difference between the two types of rigs. Given it was smaller in size, I'm going to guess it was for testing? @drum118 have any pictures?
There has been construction trailers and lots of equipment on site since last fall, but didn't count the numbers of trailers. There is a dewater system on site since the fall as well. While try to look at the site when I get back into town next week.Construction is definitely going on. A large drill rig is on site along with at least 5 construction trailers and other equipment.
A document titled GO Expansion Full Business Case that was approved by the Metrolinx board of directors in December put the total cost of the three phases of the RER project — the first-phase Early/Enabling Works, package 2 Off-Corridor projects and package 3 On-Corridor works (now called OnCorr) — at $16.2 billion.
The project will bring 15-minute service across the whole GO-owned network using new electrified trains. Construction of the final OnCorr phase is expected to start in 2021 with 2028 the targeted completion date.
Recognizing he was addressing roadbuilders, Toigo said there was a significant amount of work for ORBA contractors in various IO transit projects, with roads, bridges and other surface work required as part of such builds as the Finch, Hamilton, Hurontario and Eglinton LRT projects.