Voltz
Senior Member
Issues I can see here is that the red lanes won't have sufficient capacity. I don't think the EELRT needs to go past Sheppard and Morningside, and so having a Subway through Malvern is way overkill.For the cost of building an entirely dedicated LRT system (including OMSF), pegged at $4B, why not just keep the RapidTO lanes and run an elevated extension of Line 4? Much easier to use existing/planned TR facilities. Hits Malvern and UTSC and includes direct connection to GO at Agincourt to whisk you downtown. (This plan assumes that Line 4 is already being extended out to McCowan)
View attachment 406080