OneCity
Senior Member
Your non-stop parade of factually incorrect statements never cease to amaze me,
The previous design for Kennedy Station absolutely did allow for through running from the Crosstown to both the SLRT and EELRT.
And even when you're shown clear proof that wasn't in the design you claim "would have been". Whether it was able to or not, it wasn't, and now is. The main point was there were many design flaws. This was one of them
The addition subway and Smarttrack rendered the SMLRT EA invalid (just like your rant) and this opportunity is being used to fix some of the previous glaring flaws to make the line supportable
Last edited: