It depends. As long as the cost increases are consistent with what is expected for a subway project, I will continue to support SSE. Anyone is free to disagree with that, but do not forget that DRL, once it goes into the detailed design stage, is likely to experience the same problem, escalating costs as more technical details become known. Many posters who jeer every time they learn about the SSE cost escalations, will change their attitude and give a pass to DRL regardless of its cost escalations.
If there was a technical obstacle that makes SSE much costlier than another subway project of a similar length and in today's dollars, I would reconsider. But so far, no such technical obstacles have been discovered. There is an issue with Highland Creek but it is within normal cost variations, and might be avoided altogether by choosing a different route.
I'm sure the DRL will have more than one stop. This subway project adds one stop to our subway network and is costing 4 billion plus and rising. It's ridiculous...