Search results

  1. K

    Toronto Minto Yorkville Park Condos | 75.89m | 25s | Minto Group | IBI Group

    A temporary/permanent staging platform will not be present here.
  2. K

    Toronto TeaHouse 501 Yonge Condominiums | 170.98m | 52s | Lanterra | a—A

    The entire tunnel will be exposed during construction to have it inspected by TTC personnel and once all is well, the tunnel within the site will have new waterproofing applied. Once that's done, the structure can be built up around it. Also as part of this development, an additional ventilation...
  3. K

    Toronto The Madison | 121m | 36s | Madison Group | Kirkor

    Yes. Underway as we speak.
  4. K

    Toronto Montgomery Square | 84.12m | 27s | Rockport Group | RAW Design

    Helendale is closed for this sites' construction until December 2017.
  5. K

    Toronto Vox Condominiums | 115.82m | 35s | Cresford | a—A

    fyi, this slab you see is to facilitate construction staging and a turn around area for vehicles. The amount of construction staging area that will be present between the property and hoarding allows for zero vehicular access if this wasn't built.
  6. K

    Toronto Ten York Street Condos | 224.02m | 65s | Tridel | Wallman Architects

    This building is going to have two hoists. One on Harbour (half in the lane), one on Lake Shore (in the site though, no lanes closed).
  7. K

    Toronto Whitehaus Condominiums | 107.28m | 31s | Lifetime | Turner Fleischer

    Does anyone know when the buildings on Yonge are coming down? I see theres an approved application to take down the old rental buildings but not seeing an application yet to pull down the yonge stores....
  8. K

    Toronto 155 Redpath Condominiums | 120.39m | 34s | Freed | a—A

    Ah, i wish i was MOL. I'm wondering what it's going to take before they get some overhead protection in the NE corner of the site. No covered walkway and work happening above and adjacent. Illegal.
  9. K

    Toronto 50 at Wellesley Station | 114.9m | 37s | Plaza | BDP Quadrangle

    lol, the front page on this is wrong. That article is looking at excavation beginning at VOX, not 50 Wellesley and SHORING/DRILLING at 50 Wellesley.
  10. K

    Toronto Backstage On The Esplanade | 116.73m | 36s | Cityzen | P + S / IBI

    waterproofing any concrete structure such as what we have here requires tar based materials, then fused together with heat, aka fire and it caught fire - happens occasionally.
  11. K

    Toronto Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

    The anticipated completion date (approximately) is December 2019, fyi.
  12. K

    Toronto Art Shoppe Condos | 98.75m | 28s | Freed | a—A

    covered walkway going up here. looks like demo is imminent.
  13. K

    Toronto 150 Redpath Condominiums | 132.28m | 38s | Freed | a—A

    Fence is up around the corner house. I'd say demo is imminent.
  14. K

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Crane #1 going up here today
  15. K

    Toronto 155 Redpath Condominiums | 120.39m | 34s | Freed | a—A

    second crane going up here today.
  16. K

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Drilling commenced today on the NE portion
  17. K

    Toronto 2221 Yonge Condos | 192.62m | 58s | Tower Hill | Pei Partnership

    So I walk by here everyday and I'm not following this development too much but it appears this morning they were JUST started to get their overhead protection system set up along Yonge - I think demo could be right around the corner folks...
  18. K

    Toronto Daniels Waterfront - City of the Arts | 156.05m | 45s | Daniels | RAW Design

    Yes - The sales centre will be there, across from the site.
  19. K

    Toronto Richmond Adelaide Centre: EY Tower | 188.05m | 40s | Oxford Properties | Kohn Pedersen Fox

    If he fell +- 20ft...that puts him on one of the floors where the temporary fence is at the edge likely. As per OHSA, you don't need to be tied off if you have a guiderail/fence at the edge that complies with the requirements of a "guiderail" in the OHSA. Obviously he wasn't tied off (or there...
  20. K

    Toronto eCondos | 195.67m | 58s | Bazis | Rosario Varacalli

    Assistance crane for the tieback drill arrived yesterday. (ps, first row of tiebacks is currently underway along the eglinton wall.