News   Dec 13, 2024
 1.4K     0 
News   Dec 13, 2024
 998     0 
News   Dec 13, 2024
 2.2K     2 

Waterloo Region Transit Developments (ION LRT, new terminal, GRT buses)

The TTC also used "LRT" when planning and building the Spadina line and St. Clair ROW. They dropped the term after the lines started operation.

Glad to see so many people coming around to the idea that the terms "streetcar" and "LRT" are practically meaningless when being compared to each other. It's a continuum.

It's FAR more meaningful to discuss the design aspects of a line.
 
The TTC also used "LRT" when planning and building the Spadina line and St. Clair ROW. They dropped the term after the lines started operation.

Glad to see so many people coming around to the idea that the terms "streetcar" and "LRT" are practically meaningless when being compared to each other. It's a continuum.

It's FAR more meaningful to discuss the design aspects of a line.

The first "subway" in North America was the Tremont Street Subway in Boston, Massachusetts. It opened in 1897 using streetcars. See link. It is now part of the Green Line.

Pleasant_Street_Incline_junction.jpg
 
Is there going to be any double-track street trackage anywhere? I'm not getting any "streetcar system" impression here.

Of course. There will be double tracks along most of the length of Ion Stage 1, except for the three loops where the directions will separated onto different streets. With 8 minute headways (to start) along a length that will take rough 46 minutes, that's 5-6 trains travelling in both directions at any one time. Coordinating trains to wait on side spurs until the other direction passed would be a real PITA and would obviate much of the scalability benefits of an LRT system.
 
Nov 28

Waterloo Spur is 100% on new rails from Uptown Waterloo to Northfield. At Columbia, crossing protection is being re-installed, new signal bungalow has arrived and old rails are torn up.
Untitled by ION Construction, on Flickr

More LRT track and Uptown Waterloo station complete on Caroline.
Untitled by ION Construction, on Flickr

King St. being repaved with median now reserved for LRT. Crews were working on the weekend pouring concrete for curbs, probably a rush before the winter.
Untitled by ION Construction, on Flickr

More recently poured curbs for median on King St.
Untitled by ION Construction, on Flickr

Charles St. partially re-paved at Benton, looking great!
Untitled by ION Construction, on Flickr

Charles St. at Stirling, also looking ready for tracks.
Untitled by ION Construction, on Flickr

Most of track along Borden between Huron Park spur and Schnieder Creek has been laid.
Untitled by ION Construction, on Flickr

Huron Park spur now running over new Schnieder Creek bridge, allowing work on the new Eastern bridge for the LRT tracks.
Untitled by ION Construction, on Flickr

Grading for the LRT section running on Hydro ROW parallel to Fairway.
Untitled by ION Construction, on Flickr


Rest of today's album on Flicker.
 

Great pictures. Thanks for the update.

I've always thought that Waterloo Region should be highlighted and congratulated because they looked at all options and came up with great connections in a cost-effective way. In-median, one-way, Hydro ROW, old train tracks, etc. Not just someone opening up google maps and drawing a line down one street and then asking themselves LRT or subway? Buried or Surface?

I will miss the quick way through downtown via Charles/Stirling/Courtland/Vic Park/Park.
 
I've always thought that Waterloo Region should be highlighted and congratulated because they looked at all options and came up with great connections in a cost-effective way. In-median, one-way, Hydro ROW, old train tracks, etc.

Using the existing rail ROWs comes with the benefit of pre-existing crossing protection at road intersections - no fights with drivers for transit priority.

Piggybacking on the Highway 7 widening through Kitchener to get a second rail tunnel was a great move. That probably would have been the most disruptive and costly element to build (comparable to the King St. grade separation). This type of forward thinking isn't being applied to Phase 2 to Cambridge - as the 401 is being widened, there are no similar provisions. There will also need to be new bridges of the Grand (could have been accommodated during Highway 8 widening project) and Speed Rivers and potentially grade separation with the CP rail Galt sub. All of this means the extension to Cambridge will be significantly more costly, I'm sure.
 
Sorry for the repeat shots - many of the same photos as POper's above.

IMG_5945.jpg

Freight connection at Northfield is now shifted over to the final alignment here.

IMG_5947.jpg

This is still temporary though, until the switches get installed and finalized.

IMG_5948.jpg

Another shot looking toward the OMSF.


IMG_5952.jpg

Some conduit troughs and control cabinets along the Right of Way, behind Albert McCormic Arena.

IMG_5957.jpg

This is the future R&T Park platform.

IMG_5958.jpg

R&T Park platform work.

IMG_5960.jpg

University of Waterloo station. Some kind of maintenance road is being built on the right.

IMG_5963.jpg

One of the one-track stations on the Waterloo loop, this is on Caroline.

IMG_5966.jpg

Caroline

IMG_5971.jpg

Caroline

IMG_5976.jpg

Caroline

IMG_5979.jpg

Caroline

IMG_5982.jpg

Caroline

IMG_5989.jpg

Benton/Charles is now back open to traffic.

IMG_5990.jpg

Benton/Charles
 

Attachments

  • IMG_5945.jpg
    IMG_5945.jpg
    264.7 KB · Views: 1,150
  • IMG_5947.jpg
    IMG_5947.jpg
    256.2 KB · Views: 1,087
  • IMG_5948.jpg
    IMG_5948.jpg
    205.2 KB · Views: 1,109
  • IMG_5952.jpg
    IMG_5952.jpg
    227.6 KB · Views: 1,086
  • IMG_5957.jpg
    IMG_5957.jpg
    255.4 KB · Views: 1,068
  • IMG_5958.jpg
    IMG_5958.jpg
    198.4 KB · Views: 1,029
  • IMG_5960.jpg
    IMG_5960.jpg
    233.2 KB · Views: 1,125
  • IMG_5963.jpg
    IMG_5963.jpg
    177 KB · Views: 1,069
  • IMG_5966.jpg
    IMG_5966.jpg
    234.1 KB · Views: 1,088
  • IMG_5971.jpg
    IMG_5971.jpg
    198.1 KB · Views: 1,057
  • IMG_5976.jpg
    IMG_5976.jpg
    194.5 KB · Views: 1,104
  • IMG_5979.jpg
    IMG_5979.jpg
    166.8 KB · Views: 1,067
  • IMG_5982.jpg
    IMG_5982.jpg
    237.3 KB · Views: 1,055
  • IMG_5989.jpg
    IMG_5989.jpg
    204.6 KB · Views: 1,131
  • IMG_5990.jpg
    IMG_5990.jpg
    181.5 KB · Views: 1,098
IMG_5992.jpg

This crossing at Borden/Courtland recently re-opened. Some of the concrete is still being warmed to help it cure.

IMG_5994.jpg

IMG_5996.jpg

Looking along Borden.

IMG_5997.jpg

Lots of work still to do here, but the catpole foundations are in. There were some soil contamination issues here.

IMG_6000.jpg

Charles. This will be the location of one of the centre platform stations.

IMG_6001.jpg
IMG_6002.jpg
 

Attachments

  • IMG_5992.jpg
    IMG_5992.jpg
    196.1 KB · Views: 1,060
  • IMG_5994.jpg
    IMG_5994.jpg
    240.2 KB · Views: 1,053
  • IMG_5996.jpg
    IMG_5996.jpg
    240.4 KB · Views: 1,065
  • IMG_5997.jpg
    IMG_5997.jpg
    320.7 KB · Views: 1,068
  • IMG_6000.jpg
    IMG_6000.jpg
    237.6 KB · Views: 1,059
  • IMG_6001.jpg
    IMG_6001.jpg
    286 KB · Views: 1,032
  • IMG_6002.jpg
    IMG_6002.jpg
    262.7 KB · Views: 1,034
Some more photos from this weekend. Platforms are now uncovered at Research & Technology and Willis Way. The first few photos show the roof of the Operations, Maintenance and Storage Facility being finished in the area that was damaged by the fire a few months ago.

IMG_6003.jpg
IMG_6005.jpg
IMG_6010.jpg
IMG_6012.jpg
IMG_6014.jpg
IMG_6015.jpg
IMG_6016.jpg
IMG_6019.jpg
IMG_6020.jpg
IMG_6022.jpg
IMG_6025.jpg
IMG_6026.jpg
IMG_6029.jpg
 

Attachments

  • IMG_6003.jpg
    IMG_6003.jpg
    170.4 KB · Views: 886
  • IMG_6005.jpg
    IMG_6005.jpg
    208 KB · Views: 846
  • IMG_6010.jpg
    IMG_6010.jpg
    221.8 KB · Views: 837
  • IMG_6012.jpg
    IMG_6012.jpg
    150.8 KB · Views: 844
  • IMG_6014.jpg
    IMG_6014.jpg
    264.4 KB · Views: 837
  • IMG_6015.jpg
    IMG_6015.jpg
    252.5 KB · Views: 807
  • IMG_6016.jpg
    IMG_6016.jpg
    145.6 KB · Views: 837
  • IMG_6019.jpg
    IMG_6019.jpg
    302.2 KB · Views: 822
  • IMG_6020.jpg
    IMG_6020.jpg
    217.8 KB · Views: 836
  • IMG_6022.jpg
    IMG_6022.jpg
    154 KB · Views: 798
  • IMG_6025.jpg
    IMG_6025.jpg
    236.8 KB · Views: 844
  • IMG_6026.jpg
    IMG_6026.jpg
    262.1 KB · Views: 832
  • IMG_6029.jpg
    IMG_6029.jpg
    232.9 KB · Views: 811
I'd say the entire line is a public realm improvement. :) I'm not familiar with the term, but I imagine you mean things like the general look and feel of areas along the line?
 
I like that third image, and the vantage. That'll look really nice with an LRV zipping along on a misty morning.
 

Back
Top