As someone who play a part in writing the terms of references and the Master Waterfront Transit plan starting in 2004, its been disheartening to see the non building of most the plan today when things were to be done 10 years ago.
I have seen the removal of 3 lines over the years that were approved by TTC and council in 2006 from the Master Plan.
It was known back in 2004-2006 that TTC had a funding issue starting with the Union Loop along with the whole thing.
I stand by my position going back to 2016 that lets build the east-west line ASP and leave the tunnels and loop to TTC when they have the $600 million plus to do the work. This would see the 509/510 out of service for 6-9 months to built the T connection at Bay and the new portal once the tracks and ROW is built east of it.
Connecting the existing Cherry St Line to the new line is at the whim of ML with the building of the OL which is not a deal breaker.
If we can get the QQE up and running by 2027-30, I can live with it, but not if it later than 2030.
Transit planning has suck badly in Toronto for decades and more so since the days when TTC stop making a profit to build its expansion and started to need the city help to build things. Once TTC needed help to do things, council rank TTC far down the list as it would be costly if they rank them higher to the point the city is paying for that big mistake today. TTC is also a major problem from poor mismanagements' and reinventing the wheel at a cost of 2-4 times the normal cost by not doing it. With the city not willing to increase taxes like everyone else has been doing for years, it been cutting itself to the point things are not being built or the wrong things are being built that service very few residents of the city in the first place.
The stubborn thinking of council that.e the province or the Fed's will help them out of the current mess is falsity thinking and time to realizes they have to bit the bullet by raising taxes along with special taxes on top of it to get things built sooner than later. No different than 100's of cities in NA that have already done it.
Since there will be no new mayor yet when TTC next meeting takes place in June as well council, time to do a write in campaign to get QQE funded starting with taking the plan too 100% design and going out for bids in 2024, leaving the loop as an add on as time goes on. This a case for the mayor with power to kick start Toronto in building better transit, housing and health care, otherwise, things will only get worse.
We need to get the western extension from Exhibition to Park Lawn up and running as well.
Getting things done for King St Mall will be a fight with Queen out of action, but it needs to happen yesterday.