Bordercollie
Senior Member
The need to wye the train defeats the push pull consist and will also be restricted to slower speeds.To elaborate on the above, the requirement is now for 32 axles per train. Whereas the current set up for the Ventures is 24 axles.
This means VIA has to alter the make up of the sets and add, typically, 2 older cars into the mix to meet the count.
***
Not clear to me in the piece above is why a detector can't work properly with 24 axles passing over it, and why 8 more would be statistically likely to work any better.
It sounds more like a fault w/the detector than w/the number of axles on the train consist.
But I will await thoughts from our expert crew @smallspy and @crs1026 as well as from @Urban Sky on the implications for VIA if it has to sustain this new arrangement.
As more sets are delivered, is it not possible to canablize those to add 2 additional car's? I guess for cab cars the couplers would be an issue.