Bordercollie
Senior Member
I thought they where going to "Renew" or rebuild them, and I was like...why.
I’m reading between the lines of certain words - “Budget 2022-2023” ….. if one were submitting a proposal for funding for consideration for a future budget, one would want to have talked to the vendor community to gauge what vendor interest there might be, how prices are holding up, and what might be possible/affordable/available……
- Paul
Just as with the Corridor procurement, Canada’s commitments negotiated under the CETA agreement forbid such „Canadian Content“ requirements (let alone: „Buy Canadian“ legislation) for any rolling stock procurement for VIA:Will the government insist that they be built in Canada in retaliation for Biden’s buy American clause in his Build Back Better bill?
Just as with the Corridor procurement, Canada’s commitments negotiated under the CETA agreement forbid such „Canadian Content“ requirements (let alone: „Buy Canadian“ legislation) for any rolling stock procurement for VIA:
View attachment 371797
Will the government insist that they be built in Canada (or the EU) in retaliation for Biden’s buy American clause in his Build Back Better bill?
That makes a lot of sense. I was wondering what inside information VIA has about the budget that they would be able to share,
I‘m not sure I understand the technical details of the second part of your post, but I don‘t see a reason why CETA would allow to discriminate against a European manufacturer which wishes to produce most or all parts of his goods in a third country. Meaning: CETA may still allow local content rules, but only if European companies are excluded from these trade barriers…Ok, let me change it to:
I’m not a lawyer, but that should satisfy CETA.
I wonder if insisting that they conform to Canadian standards and use American wire and sheet metal gauges be acceptable to CETA? It is difficult (expensive) to get metic wire and sheet metal here for long term maintenance, and substituting the closest equivalent can be problematic.
It will certainly be interesting to see how this plays out. Will Siemens be interested in making a long distance variant of their Venture cars, and with Amtrak’s order in the queue, will they even be able to build them in a reasonable timeframe? Would VIA want a variant of the Viewliner II (recently built by CAF for Amtrak)? What other alternatives are there?
It would likely be something existing and off the shelf.We'll see who bids. But Siemens already has a sleeper version of the Viaggio Comfort, that the Siemens Venture was based on. ÖBB has a massive 33 trainset order in, for their Nightjet service. They took first delivery in September. Siemens would be wise to Americanize that design and just expand Venture manufacturing capacity to deliver additional orders.
It would likely be something existing and off the shelf.
Bombardier bid last time but they dont have anything in production and there are no proven examples of their products running in North America ( in this category).
Unless an updated superliner is what VIA is looking for but I'm not sure if they would fit in Winnipeg Station or through the tunnels in BC. Someone on this forum said that they where too tall.
However restarting a production line for an order this size might be costly.
That's why logically the lowest bidder would be a company that has things in production.
Does Alstom/Bombardier have something off the shelf?Debatable. CAF or Alstom/Bombardier could well decide to take a hit on this order to help setup their operations in anticipation of a larger Amtrak order down the road. Also, CAF just wrapped up their Viewliner order. They could decide to underprice and win this bid just to keep the plant going.
We should recognize here that VIA's interests (lower operating costs from commonality) should trump industrial interests in this case. I hope VIA takes into account commonality savings that would arise from operating an all-Siemens fleet. Hopefully, it's not just the lowest bid and focuses on the lowest TCO. VIA really, really needs to get their operating costs down while boosting output.
VIA might be interested in a license built Viewliner if it wasn't built by CAF (I *think* Amtrak owns that design) although there are no View2 observation cars, or coaches for that matter. I would favour a joint Amtrak order for western LD but there are issues with that (among others having to raise the roof on/jack up Winnipeg shed). The other issue would be whether VIA wants an FRA Tier 1 design or thinks it will be able to get away with something lighter by the time it arrives.Would VIA want a variant of the Viewliner II (recently built by CAF for Amtrak)? What other alternatives are there?
As long as they are not higher than the Budd domes we have now, it should not be a problem.VIA might be interested in a license built Viewliner if it wasn't built by CAF (I *think* Amtrak owns that design) although there are no View2 observation cars, or coaches for that matter. I would favour a joint Amtrak order for western LD but there are issues with that (among others having to raise the roof on/jack up Winnipeg shed). The other issue would be whether VIA wants an FRA Tier 1 design or thinks it will be able to get away with something lighter by the time it arrives.
I just realized that Superliners are just 4 inches (10 cm) higher than the HEP Dome cars (i.e. 16‘2“ vs. 15‘10“) and I can‘t imagine them to be higher than triple-stack auto transporting cars. However, given that they already had to remove the catenary wires at a few tracks in Gare Centrale to allow the Ocean to operate into the station, these 4 inches might just be too much.It would likely be something existing and off the shelf.
Bombardier bid last time but they dont have anything in production and there are no proven examples of their products running in North America ( in this category).
Unless an updated superliner is what VIA is looking for but I'm not sure if they would fit in Winnipeg Station or through the tunnels in BC. Someone on this forum said that they where too tall.
However restarting a production line for an order this size might be costly.
That's why logically the lowest bidder would be a company that has things in production.
I don’t see a reason why CP would regain any trackage rights for the Eastern half of the Havelock Sub - they‘ve surrendered all rights when they abandoned and sold the ROW…The point of this being that CP might push enough traffic up the Havelock (when re-opened) and Belleville to dictate upgrades to the Winchester - but for its purposes. Similarly, some non-VIA projects like Missing Link, or other ideas about co-production, might be (even) less attractive to CP if it gives them less leeway to make money themselves.