Steve X
Senior Member
This isn’t necessary a bad thing.That’s precisely the problem. The first four subway lines were build by the TTC in Toronto. Now they are being built by metrolinx
TO politics are too bias for themselves while upholding favours to Torontoians. After they try justify an express subway to STC. They do deserve to get their planning rights revoked. They are also indecisive like planning for a tunnel under the Lawrence/Kingston Rd/Morningside intersection and yanking it out again.
Subway extensions have to be compatible with the current system. So this eliminates all the “unknown” factors. The TTC does have a say on what they could use on the track material. I do question their ability of maintaining the system as they seem to be clueless now with all the slow zones and the SRT track failure incident.




