rbt
Senior Member
Pardon my ignorance but I thought ATC was done on Line 1.
Why is it closed again?
Phase 1 through 5 deployed ATC using pre-existing switch and stop locations. There is a phase 6 which optimizes these things a bit, including shifting the Eglinton station stop locations a little north.
I assume that this is the start of Phase 6.