nfitz
Superstar
What problems are these? They are current churning out 2 or 3 TR subway cars a week, and this ends in late 2015 or early 2016 long before they have to start deliveries for the Flexity Freedom.The delays with the Flexity Outlook streetcar order from Bombardier may, correction will, have a problem with their other Flexity Freedom order for the light rail vehicles to be used on the Crosstown LRT. However, those Flexity Freedom vehicles will not have the street level ramps, the problem would be more with available space at the factory to assemble them.
The first Flexity Freedom delivery is scheduled in summer 2016 for the late 2017 opening of the Waterloo Ion line. It shouldn't be too onerous to deliver those 14 cars at about one a month. Then they can ramp up in 2017 to deliver the 76 vehicles for Eglinton. Not that I'm particularly optimistic about the 2020 opening. I wouldn't be surprised that when they announce the winning bidder later this year, that the schedule slips to 2022.