Some construction notices that I missed:
Chester Station - elevator construction
Starting as early as August 20, 2018
Work description and purpose
Starting as early as August 20, construction of the Easier Access elevators at Chester Station will begin. Two new elevators will be constructed on the west side of the main station. Utility work within TPA lot 87 will also take place.
What to expect and work hours
- Activities will include the excavation, shoring and concrete pouring of the two elevator shafts.
- Noise and vibration associated with construction can be expected with this work. The contractor will work to keep both to a minimum.
- A work zone will be set up in the Toronto Parking Authority Lot - No.87 as early as August 15 to carry out utility work. Access to the laneway will not be possible from the parking lot, but it will remain accessible from Ainsworth Road to the north. The laneway south of the parking lot will remain accessible from the south entrance.
- Delivery of large equipment and materials to the site will take place as early as August 15.
- Work hours are scheduled Monday to Friday from 7 a.m. to 7 p.m. Some weekend work may be required at times. Some delivery of equipment and materials will take place after 7 p.m.
Pedestrian, Cycling and Vehicular Access
- Access to the main entrance of Chester Station will be maintained during construction.
- The pedestrian walkway north of the station will remain accessible as long as safely possible during construction.
- The Bike Share station north of the station will remain accessible as long as safely possible during construction.
- Vehicular traffic will be maintained on Chester Avenue.
- Two-way traffic on Arundel Avenue will be permitted up to the parking lot entrance only.
Thank you for your patience as we work to improve transit accessibility and safety at Chester Station.
For further information:
Niki Angelis, Community Liaison, 416-981-1532,
niki.angelis@ttc.ca
Christie Station Easier Access project land surveying
Starting as early as Monday, July 30, 2018
Project description and purpose
The TTC’s Easier Access Program makes stations accessible for everyone with the addition of new elevators.
Two elevators are planned at the existing main entrance at Christie Station (exact locations are to be determined). One elevator will go from street level to concourse, down to the westbound platform. A second elevator will connect the concourse level to the eastbound platform.
As a first step in the elevator design process, Christie Station and the local area will be surveyed. Station improvements construction is currently scheduled to be completed by 2023.
Land surveying and related activities
Survey activities involve gathering accurate measurements of the area, which may include having contracted field staff in the vicinity placing surveying markers at property corners and elsewhere. During the course of survey activities, field staff will attempt to contact some building occupants directly should access be required to private property, such as backyards.
TTC Contacts
- Denise Jayawardene, Community Liaison, 416-393-6937, denise.jayawardene@ttc.ca
- Customer Service: 416-393-3030 (daily 7:00 a.m. to 10:00 p.m., closed holidays) or @TTChelps
Greenwood Station Easier Access project land surveying
Starting as early as July 23, 2018
Project description and purpose
The TTC’s Easier Access Program makes stations accessible for everyone with the addition of new elevators.
Two elevators are planned at Greenwood Station (exact locations are to be determined). One elevator will go from street level to concourse, down to the eastbound platform. A second elevator will connect the concourse level to the westbound platform.
As a first step in the elevator design process, Greenwood Station and the local area will be surveyed. Station improvements construction is currently scheduled to begin in 2021.
Land surveying and related activities
Survey activities involve gathering accurate measurements of the area, which may include having contracted field staff in the vicinity placing surveying markers at property corners and elsewhere. During the course of survey activities, field staff will attempt to contact some building occupants directly should access be required to private property, such as backyards.
TTC contacts
- Denise Jayawardene, Community Liaison, 416-885-9552; denise.jayawardene@ttc.ca.
- Customer Service, 416-393-3030 (daily 7 a.m. to 10 p.m., closed holidays) or @TTChelps.
- TTY Line, 416-481-2523 (daily 8 a.m. to 5 p.m., closed holidays).
- Route/Schedules/Fares: 416-393-4636 (INFO) or ttc.ca.
Old Mill Station Easier Access Project land surveying
Starting the week of July 30, 2018
Project description and purpose
TTC’s Easier Access Program makes subway stations accessible to everyone, regardless of their level of mobility with the addition of new elevators (at the main entrance). New elevators are planned for Old Mill Station in order to take customers from street level to platform level.
As a first step in the design process for the new elevators, Old Mill Station and the local area will be surveyed.
Land surveying and related activities
Activities may include field staff gathering measurements and placing survey markers at property corners and elsewhere. Field staff will attempt to contact building/home occupants directly should access to private areas be required. In most instances, access to properties is for a short duration. The field crew will consist of staff wearing reflective vests.
Survey area
Staff will be surveying the surrounding area of the station east of Old Mill Trail, and in King’s Mill Park beneath the subway up until the western edge of the parking lot.
Expected survey dates and hours
Beginning in the station the week of July 30, 2018, between 8 a.m. and 4 p.m., surveyors will be present in the Old Mill Station area (weather permitting).
Notice issued to:
2662 Bloor Street. W., 10, 12 & 39 Old Mill Trail
TTC contacts
- Paul Tran, Community Liaison, 416-981-1601; paul.tran@ttc.ca.
- Customer Service, 416-393-3030 (daily 7 a.m. to 10 p.m., closed holidays) or @TTChelps.
- Route/Schedules/Fares: 416-393-4636 or ttc.ca.
Rosedale Station - Easier Access Project
Preliminary borehole testing starting as early as October 11, 2018 to October 31, 2018
Project description and purpose
The TTC’s Easier Access Program makes stations accessible for everyone with the addition of new elevators. Rosedale Station is currently scheduled to be accessible by 2025. As a first step in the design process, Rosedale Station and the local area’s soil and groundwater conditions will be investigated.
Initial borehole testing work details
- Prior to construction, borehole tests are required. Boreholes obtain information from the underground soil and groundwater conditions within the vicinity of the future elevator location. The information obtained will inform the design of future underground structures.
- Small work zones will be set up in the borehole areas and metal plates will be used to cover the holes within the City right-of-way on Crescent roadway/bridge area, on the sloping retaining wall beside the station and on TTC property. Some trees and bushes planted on the sloping retaining wall will be trimmed to allow for this work.
- Each borehole will take approximately 5 days to complete (weather pending).
- Construction crews and vacuuming equipment will be present along Crescent Road and trucks/equipment will remain overnight. During the day, some construction noise is expected.
- Pedestrian detours will be in place. For safety reasons, please cross the street at the traffic signals at the Yonge Street intersection.
Noise and vibration
Noise and vibration associated with construction can be expected with this work. The contractor will work to keep both to a minimum.
Work hours
Most work will take place from 7 a.m. to 7 p.m., with some extensions outside of these hours in order to complete the work as quickly as possible.
For further information:
Denise Jayawardene, Senior Community Liaison, 416-885-9552,
denise.jayawardene@ttc.ca.