Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

Yesterday,
20230626_171345(0).jpg
 
July 10
I last shot the site in May 18/22 and haven't miss much
53039116852_86f63d4f54_b.jpg

53039116847_8ae8274b21_b.jpg

53039706056_bfec6941e4_b.jpg

53039889124_568b5518fa_b.jpg

53039706126_898c30702a_b.jpg
 
I was wondering what's taking so long for this development to go above grade!
It's still not there as you can see in the photos up above.
 

Back
Top